COMMISSIONING AND TESTING
01-UDBRG_V1-DIMU-00-EN
31
8
COMMISSIONING AND TESTING
Once all the connections have been made, the appliance and the overall installation must be checked
following the directions given in this manual.
CHECK IN PARTICULAR:
That the protective film has been removed from the external surfaces;
That the panels of the machine are closed correctly;
That connections have been made in accordance with the requirements and directions indicated in this
manual;
That all safety requirements in current standards, statutory regulations and directives have been met;
That the power cable is not subjected to traction and is not in contact with hot surfaces;
That the water, gas and steam connections are tight and not subjected to traction.
Now proceed to light the appliance as directed in the instructions for use.
While the appliance is in use, voltage should not differ from the nominal voltage more than +/- 10%.
In the gas models:
Check that the flue gas exhaust is not clogged and that they are expelled without any hindrance.
Repeat "
CONTROL OF THE GAS INLET PRESSURE
" with the machine running.
If you have other machines connected to the main pipe of the gas, although these have to be put into
operation, to perform a correct control of of the pressure of inlet gas.
The test report must be completed in full and submitted to the customer who should
then sign in acceptance. With effect from this moment, the appliance is covered by the
manufacturer’s warranty
Attention if the display shows:
The safety thermostat of
the equipment has
intervened. The
equipment is switched
off.
The safety thermostat can be disarmed
during transport without any anomalies, or
with temperatures close to 0 ° C
Disconnect the machine from the power
supply.
Remove the lower right control panel and
reset the thermostat, pressing firmly on the
red thermostat button.
In case of new thermostat intervention
contact the assistance service.