Fireplace Placement Requirements

Minimum Framing Dimensions

45-1/2"

We recommend installing the 
shaded framing members 
after installing the chimney.  
Arrange the framing 
members so there is not a 
vertical member directly in 
the center of the opening 
where it would interfere with 
pipe clearances.

26"

43"

Header
(install veritcally to 
ensure proper pipe to 
header clearance) 

A firestop is required at the top of 
the fireplace enclosure or ceiling 
level (whichever is lower).

Min. 4-1/2"

NOTE: make sure the 
enclosure is wide enough to 
accommodate the blower 
(see the section"Blower" for 
details).

The fireplace enclosure must not be 
less than 81" above the base of the 
fireplace.  
• If the fireplace is raised, the 

enclosure height must be raised to 
maintain the 81".

• Do not build into this area.  
• Do not slope the walls inward.  
• The header, vertical framing 

members, and all interior wall 
surfaces may protrude a maximum 
4" into this area.

The fireplace uses 1/2" standoffs on the back and sides and 4" stand-offs on the top to space the
fireplace away from framing members or walls.  These stand-offs may contact the framing members or
walls but do not place insulation or other material in the space between the stand-offs and fireplace.

AA

AA

AA

AA

AA

AA

AA

AA

AA

AA

AA

AA

AA

AAA

AAA

AAA

AAA

AAA

AAA

AA

AA

AA

AA

AA

AA

AA

AA

AA

AA

AA

AA

Travis Industries 
recommends the chase 
around the fireplace be 
insulated.  This insulation 
should only be placed 
between the framing 
members and secured so 
it does not fill the space 
between the fireplace and
standoffs.

Bend this bracket down 
on each side and nail it 
to the floor, securing the 
fireplace in position.

These lifting handles are 
removed (use a 7/16" wrench) 
once the fireplace is in place.

Standoffs (also 
located on back)

The fireplace (and 
firebox) must be made 
level and plumb during 
installation.  Use shims 
under the fireplace to 
properly level the 
fireplace.  

Zero 

Clearance 

Can

Firebox

WARNING:
Failure to correctly level and plumb 
this fireplace will lead to doors that 
swing open or closed.

AAA

AAA

AAA

AAA

AAA

AAA

AAA

The fireplace must be secured to the floor (use the lifting handle brackets - see illustration above).

Fireplace must be placed directly on wood or non-combustible surface (not on linoleum or carpet)

Содержание 36 ELITE-ZC

Страница 1: ...A AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA Zero Clearance Fireplace Listed Tested to U L 127 and portions of U L 1482 907 36 ELITE ZC INSTALLATIO...

Страница 2: ...nts 7 Cooling Vents 8 Blower 9 Blower Duct Connection 9 Blower Electrical Connection 10 Chimney 11 Chimneys Part Numbers 11 Chimney Connection to Fireplace 11 Chimney Height 12 Special Chimney Require...

Страница 3: ...ns Heating Specifications Approximate Heating Capacity in square feet 1 200 2 500 Will vary with the home s Maximum Burning Time Up to 10 Hours floor plan insulation and BTU Output per Hour Cord Wood...

Страница 4: ...ber Strip Log Retainer includes allen wrench instructions Flex Duct w start collar 3 Length 6 Dia For Blower Two 10 Flex Ducts 6 Diameter For Cooling Vents Two Vent Hoods For Cooling Vents Two Vent Ho...

Страница 5: ...space the fireplace away from framing members or walls These stand offs may contact the framing members or walls but do not place insulation or other material in the space between the stand offs and f...

Страница 6: ...ible floor EMBER STRIP INSTRUCTIONS Clearances When installed walls in front of the fireplace must be a minimum 18 to the side of the faceplate or 15 1 2 from the side of the fireplace see the illustr...

Страница 7: ...brick river rock etc use the face being installed to create a template The fireplace is shipped with a set up face that is 1 16 larger on the top bottom and each side than the faceplate Leave the set...

Страница 8: ...e fireplace recess the framing directly next to the fireplace See the illustration below 1 2 Drywall AAAA AAA1 2 Concrete Board 3 8 Tile Fireplace Overlapped Facing Framing 1 2 Drywall AAA AAAA 1 2 Co...

Страница 9: ...m 18 Hearth must extend a minimum 8 to both sides of the faceplate 52 wide Hearth must be a minimum 1 thick of cement board or equivalent Hearth must not rise more than 6 1 2 above the base of the fir...

Страница 10: ...are two 12 lengths of vent use a connector and seal if adding more length The duct terminations must be located so they can not be blocked e g snow drifts Included with the fireplace is a set of stor...

Страница 11: ...uilding codes NOTE certain codes require a fire curtain in these cases Blower Duct Connection The blower may be placed in a ventilated crawl space if approved by the local building department AAAAAAAA...

Страница 12: ...ace AAA AAA Blower Conduit Snap this piece into the top of the blower housing White Common Junction Box Exposed Ground Black Hot Screw this piece into the junction box Use wire nuts or other approved...

Страница 13: ...en reposition the L brackets if necessary so they are directly adjacent the exterior of the chimney Use a drill with a 5 16 driver bit to re install the L brackets use the existing sheet metal screws...

Страница 14: ...ly enclosed when passing through living space with a minimum 2 clearance to combustibles 3 Min 2 Min 10 System Height 35 Max 15 Min 2 Min Air Space to Combustibles Rain Cap Storm Collar Flashing Fires...

Страница 15: ...back wall 4 1 2 minimum on the front wall and header and 18 minimum to the side walls The table below details the amount of offset X and rise R gained from various chimney lengths when used with 30 e...

Страница 16: ...an 81 above the base of the fireplace If the fireplace is raised the enclosure height must be raised to maintain the 81 Do not build into this area Do not slope the walls inward The header vertical fr...

Страница 17: ...4 16 1 2 x 24 3 4 10 12 16 x 23 3 4 16 x 25 1 2 16 1 2 x 24 1 4 16 1 2 x 26 11 12 16 x 25 16 x 26 3 4 16 1 2 x 25 1 2 16 1 2 x 27 1 4 12 12 16 x 26 1 8 16 x 28 1 8 16 1 2 x 26 5 8 16 1 2 x 28 5 8 Chi...

Страница 18: ...er included with the faceplate Use a phillips screwdriver to remove the 10 screws holding the set up face in place Phillips Screwdriver 2 Make sure the firebrick is properly in place 3 Install the log...

Страница 19: ...rebox 6 If installing a catalyst temperature meter do so now see the instructions included with the temperature meter 7 The faceplate is packaged with the faceplate attachment screws Use a phillips sc...

Страница 20: ...CIRCUIT IS ACTIVE Make sure the door is closed Attach the two male quick connects from the switch plate to the two female quick connects leading from the fireplace These male quick connects are for th...

Страница 21: ...his picture are out of alignment AA AA AA AA AA A AA AA A A A A Door Hinge pin Add washers to the hinge pins to make the doors align horizontally a b 11 Adjust the door latch if necessary to make a sn...

Страница 22: ...LISTING INFORMATION PAGE 22 The listing label is shown below It can be found on the base of the fireplace behind the faceplate...

Страница 23: ...LISTING INFORMATION PAGE 23...

Страница 24: ...lation 19 Facing Requirements 5 Features 1 Finalizing the Installation 16 Firebrick Placement 16 Fireplace Placement Requirements 3 Firestops 14 FMI Chimney 11 Framing Dimensions 3 Grate Placement 16...

Отзывы: