background image

I

NSTALLATION 

(C

ONTINUED

)

P

AGE 

15

be used.  Follow the manufacturer's instructions for the use of flashing and an adjustable storm collar
at the roof line to prevent water from entering the house.  Manufacturers require that chimneys
extending beyond a certain height above the roof (frequently above 5') must also be braced.

Using Offsets

30° Elbows may be used to offset the chimney (to
align the chimney or gain clearance to combustibles

A maximum four 30° elbows may be used

Each elbow must be used in conjunction with a
return elbow (so the chimney returns to a vertical
direction)

If using a single offset (two 30° elbows) a
maximum of 8' of inclined chimney may be used
between elbows.

If using two offsets (four 30° elbows) a maximum
of 4' of inclined chimney may be used between
each set of elbows.

For every 6' of inclined chimney a flue support is
required

Elbows may be used directly off the top of the
fireplace (maintain a 5" clearance to combustibles
on the back wall, 4 1/2" minimum on the front wall
and header, and 18" minimum to the side walls)

The table below details the amount of offset ("X")
and rise ("R") gained from various chimney
lengths when used with 30° elbows.  Make sure to
add the amounts for both elbows.  Two sections
may be added together to form a combined length.
For example, 12" and 18" Temco chimney sections
give an offset of 17-5/8" (3-7/8" + 5-3/8" + 8-3/8"
= 17-5/8").  The rise ("R") equals 38-1/8" (14-3/8"
+ 9-1/4" + 14-1/2" = 38-1/8").

X

R

Max. of 30 
degrees

4' Max.

Chimney must be totally 
enclosed when passing 
through living space with a 
minimum 2" clearance to 
combustibles.

Firestop

Firestop

2" 
Min.

Cooling Vents

Temco 82 Series

Superior TF8

FMI 8DM

Marco 8D

M E A S U R E D

OFFSET

RISE

OFFSET

RISE

OFFSET

RISE

OFFSET

RISE

IN INCHES

"X"

"R"

"X"

"R"

"X"

"R"

"X"

"R"

2 Elbows

3 7/8

14 3/8

4

15

4 3/8

16 3/8

5 1/4

19 1/4

12" Section

5 3/8

9 1/4

5 1/4

9

5 3/8

9 1/8

5 1/4

9

18" Section

8 3/8

14 1/2

8 1/4

14 1/4

8 3/8

14 3/8

8 1/4

14 1/2

24" Section

11 3/8

19 5/8

---

---

---

---

---

---

36" Section

17 3/8

30

17 1/4

30

17 3/8

29 7/8

17 1/4

30 1/4

48" Section

23 3/8

40 3/8

23 1/4

40 1/4

23 3/8

40 1/4

23 1/4

40 1/2

Flue Support

1 1/2

2 3/8

1 1/2

2 1/2

6 3/4

11 3/4

5 1/4

9 1/4

Содержание 36 ELITE-ZC

Страница 1: ...A AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAA Zero Clearance Fireplace Listed Tested to U L 127 and portions of U L 1482 907 36 ELITE ZC INSTALLATIO...

Страница 2: ...nts 7 Cooling Vents 8 Blower 9 Blower Duct Connection 9 Blower Electrical Connection 10 Chimney 11 Chimneys Part Numbers 11 Chimney Connection to Fireplace 11 Chimney Height 12 Special Chimney Require...

Страница 3: ...ns Heating Specifications Approximate Heating Capacity in square feet 1 200 2 500 Will vary with the home s Maximum Burning Time Up to 10 Hours floor plan insulation and BTU Output per Hour Cord Wood...

Страница 4: ...ber Strip Log Retainer includes allen wrench instructions Flex Duct w start collar 3 Length 6 Dia For Blower Two 10 Flex Ducts 6 Diameter For Cooling Vents Two Vent Hoods For Cooling Vents Two Vent Ho...

Страница 5: ...space the fireplace away from framing members or walls These stand offs may contact the framing members or walls but do not place insulation or other material in the space between the stand offs and f...

Страница 6: ...ible floor EMBER STRIP INSTRUCTIONS Clearances When installed walls in front of the fireplace must be a minimum 18 to the side of the faceplate or 15 1 2 from the side of the fireplace see the illustr...

Страница 7: ...brick river rock etc use the face being installed to create a template The fireplace is shipped with a set up face that is 1 16 larger on the top bottom and each side than the faceplate Leave the set...

Страница 8: ...e fireplace recess the framing directly next to the fireplace See the illustration below 1 2 Drywall AAAA AAA1 2 Concrete Board 3 8 Tile Fireplace Overlapped Facing Framing 1 2 Drywall AAA AAAA 1 2 Co...

Страница 9: ...m 18 Hearth must extend a minimum 8 to both sides of the faceplate 52 wide Hearth must be a minimum 1 thick of cement board or equivalent Hearth must not rise more than 6 1 2 above the base of the fir...

Страница 10: ...are two 12 lengths of vent use a connector and seal if adding more length The duct terminations must be located so they can not be blocked e g snow drifts Included with the fireplace is a set of stor...

Страница 11: ...uilding codes NOTE certain codes require a fire curtain in these cases Blower Duct Connection The blower may be placed in a ventilated crawl space if approved by the local building department AAAAAAAA...

Страница 12: ...ace AAA AAA Blower Conduit Snap this piece into the top of the blower housing White Common Junction Box Exposed Ground Black Hot Screw this piece into the junction box Use wire nuts or other approved...

Страница 13: ...en reposition the L brackets if necessary so they are directly adjacent the exterior of the chimney Use a drill with a 5 16 driver bit to re install the L brackets use the existing sheet metal screws...

Страница 14: ...ly enclosed when passing through living space with a minimum 2 clearance to combustibles 3 Min 2 Min 10 System Height 35 Max 15 Min 2 Min Air Space to Combustibles Rain Cap Storm Collar Flashing Fires...

Страница 15: ...back wall 4 1 2 minimum on the front wall and header and 18 minimum to the side walls The table below details the amount of offset X and rise R gained from various chimney lengths when used with 30 e...

Страница 16: ...an 81 above the base of the fireplace If the fireplace is raised the enclosure height must be raised to maintain the 81 Do not build into this area Do not slope the walls inward The header vertical fr...

Страница 17: ...4 16 1 2 x 24 3 4 10 12 16 x 23 3 4 16 x 25 1 2 16 1 2 x 24 1 4 16 1 2 x 26 11 12 16 x 25 16 x 26 3 4 16 1 2 x 25 1 2 16 1 2 x 27 1 4 12 12 16 x 26 1 8 16 x 28 1 8 16 1 2 x 26 5 8 16 1 2 x 28 5 8 Chi...

Страница 18: ...er included with the faceplate Use a phillips screwdriver to remove the 10 screws holding the set up face in place Phillips Screwdriver 2 Make sure the firebrick is properly in place 3 Install the log...

Страница 19: ...rebox 6 If installing a catalyst temperature meter do so now see the instructions included with the temperature meter 7 The faceplate is packaged with the faceplate attachment screws Use a phillips sc...

Страница 20: ...CIRCUIT IS ACTIVE Make sure the door is closed Attach the two male quick connects from the switch plate to the two female quick connects leading from the fireplace These male quick connects are for th...

Страница 21: ...his picture are out of alignment AA AA AA AA AA A AA AA A A A A Door Hinge pin Add washers to the hinge pins to make the doors align horizontally a b 11 Adjust the door latch if necessary to make a sn...

Страница 22: ...LISTING INFORMATION PAGE 22 The listing label is shown below It can be found on the base of the fireplace behind the faceplate...

Страница 23: ...LISTING INFORMATION PAGE 23...

Страница 24: ...lation 19 Facing Requirements 5 Features 1 Finalizing the Installation 16 Firebrick Placement 16 Fireplace Placement Requirements 3 Firestops 14 FMI Chimney 11 Framing Dimensions 3 Grate Placement 16...

Отзывы: