Firebird Enviromax Condensing Range
9
62
COMMISSIONING
It is recommended that commissioning is carried out by
a competent and qualified service engineer.
It should be noted that it is the responsibility of the
installer to ensure that the boiler is properly
commissioned. Failure to do so may invalidate the
boiler guarantee and any extended warranty.
PROCEDURES
1. OIL TANK
The installation of the oil tank and supply line should
comply with all the instructions shown earlier in this
manual. Consult OFTEC Manual - Book No. 3, Section 2.
If a single supply line is used ensure that the bottom of
the tank is above the burner. A suction line system via a
de-aerator should be used where the level of the oil in
the tank may fall below the level of the oil burner pump.
CHECK AND ENSURE CORRECT GRADE FUEL OIL HAS
BEEN SUPPLIED.
2. THE BURNER
A two single pipe system may also be used in low-level
tank installations. See page 21 Section 5. Please flush
out oil pipe by drawing off some oil before connecting
fuel pipe to burner - otherwise there is a danger of grit
and dirt being forced into the burner pump, resulting in
pump blockage, damage and ‘lock-out’
3. THE BOILER
A.
Switch off the power supply, ensure that the
boiler and system is full of water, all valves are
open and that installation conforms with all
Standards, Regulations and Instructions.
B.
Depending on condensate disposal system
check that the condensate trap is primed or
pump is operational.
C.
Check that boiler baffles are correctly
positioned.
D.
Check the oil supply by disconnecting the oil
supply hose at the burner and running off a
quantity to ensure it is free from air. then bleed
air from burner pump. Refer to section 7, page
56, sketch Fig. 5.
ATTENTION
It is the responsibility of
INSTALLER / HOUSEHOLDER
to ensure that the boiler is
PROPERLY COMMISSIONED
by a competent or OFTEC
registered engineer.
Failure to have the appliance
commissioned and warranty card
completed and returned may
invalidate the warranty.
It is not the responsibility of the
Manufacturer or the Supplier if a
boiler will not operate properly
due to non commissioning of the
appliance.
PLEASE NOTE:
Should a site inspection be
required from the manufacturers
engineer, a call-out fee
will be charged if the fault
is a result of incomplete or
incorrect commissioning.
ALL OIL FIRED BOILERS
INSTALLERS
Содержание Enviromax Combi C20
Страница 2: ......
Страница 29: ...Firebird Enviromax Condensing Range 3 27 3 3 COMBI PLUMBING PARTS...
Страница 33: ...Firebird Enviromax Condensing Range 3 31 3 4 SYSTEM PLUMBING PARTS...