Notifier Inertia-888 User, Technical & Programming Manual
Copyright (c) 2005, Notifier Inertia
PLACING INTO OPERATION
INITIAL CHECKLIST
System General Appearance Good
Cabinet Keyed 003
All Circuit Boards Firmly Fastened
Manual Call Point Fitted & Functional
Viewing Window Clear And Firmly Secured
Cable Entries Adequately Sealed
240VAC Cabling Correctly Terminated
All Earthing Secured
Transformer Securely Mounted
Transformer Correctly Wired
All Ribbon Cables Firmly Secured
All Operational Zones Adequately Identified
INERTIA-888 Manufacturing Label Affixed
POWER UP CHECKLIST
Ensure Batteries Are Disconnected.
Turn Mains Switch To "ON"
The "Mains On" LED Should Light.
Allow 15 Seconds For The Panel To Perform its Start Up Tests.
Connect Batteries
FUNCTIONAL TESTING
Primary AC Supply Voltage: 6% -10%
Charger Output Voltage Without Batteries: 27.3V DC
Main Supply Output Voltage : 26.5V DC
Keypad Functional
Perform Auto Test
LED's All Functional
Zone Fault Detection
Zone Alarm Detection
Internal Sounder Operating
MCP Loop Wired To Zone Number ______
Test Bell Output
Test Warning System Output
Test ACF Output
Test Bell Output Supervision
Test Warning System Output Supervision
Test ACF Output Supervision
Test Standby Relay
Test General Alarm Relay
Test Auxiliary Relay
Test Mimic Outputs
Test Relay Board (if fitted)
Log Book Inside Cabinet
Press "Battery Test" Once
If Batteries Are Flat, Allow 24hrs To Charge And Then Re-test.