Doc# 71-0170
4215-141
Rev. 02
5
08/23/2022
NOTE: For ease of installing the panels, tilt the top of each panel
back to get the tongue and groove alignment started. Then tilt
forward for an easy fit.
(Image 4)
4.
Secure the back wall to the right wall with three 3” Torq screws
(screws and bit provided). Install one screw on the top of the wall,
one in the middle, and one on the bottom. Ensure the tongue and
groove wall boards are tight together at the interior corner of the
sauna and the corner is flush on the outside edge when screws are
installed.
(Image 5)
5.
Secure the two wall panels together with a 3” screw (screw
provided) where the panels meet on top. Ensure tongue and
groove are fully engaged.
(Image 6)
6.
Continue setting the panels into place matching base number with
panel number as marked.
NOTE: A rubber mallet or wood block and standard hammer can
be used to make sure that the bottoms of each panel are even
with the corners of the base frame/floor perimeter. Be careful not
to damage the panels when using this technique.
Top Plate Installation
7.
After installing the wall panels, install the 1” thick top plate. This
top plate aligns and locks the top of the wall panels together.
NOTE: Before installing top plates, ensure all panels are fully
connected on top and on the corners.
8.
Install back top plate first. Matching top plate with the
corresponding wall panel number.
(Image 9)
Install notched ends
facing up.
(Image 7)
9.
Install the left and right wall top plates notched end facing down. So,
they fit into the notches of the corresponding top plate.
(Image 8)
10.
Firmly press down (use a hammer if needed) until top plates rest
on the framework of the wall panels.
(Image 8)
11.
The top of the plate should be flush with the top of the interior
tongue and groove.
12.
Secure top plates using the 2” Torque screws (screws included).
Install one screw in each corner and one screw in the center of
each wall.
(Image 10)
Image 5
Image 6
Image 7
Image 8
Image 9
Image 10