17
LOADING PROCEDURE (CONTINUED)
4. Piping System Cleanout Procedure (Purging Line) [Continued]:
D. With the engine at low idle, turn on the pump clutch by flipping the clutch toggle
switch [with the orange icon
(
)
] to the
ON
(
)
position (all the way up). The
switch will automatically center itself, which is the ON position.
E. Increase engine speed to approximately 1/2 to 3/4.
F. When discharge stream is clear, open recirculation valve and close discharge
valve. After recirculation stream is clear, disengage (turn off) pump clutch.
G. Replace coupler gasket in the remote valve coupler.
5. Continue filling tank with water.
6. Increase engine speed to full RPM.
7. Start loading dry material, loading the lightest material first. Agitator control should be in
full REVERSE for mixing.
A. Seed – Cut open the seed bag and dump contents into slurry tank. (When using
inoculant, add it in the tank along with the seed.) When using quick-swelling
seeds, load them just prior to application.
B. Fiber mulch – Empty the entire bag in or cut bag open and drop in the sections
of fiber. The amount of mulch to be used should be loaded by the time the water
level is at 3/4 full. If agitator stalls, or a high pitch squeal comes from the hydraulic
sytem, reverse agitation direction to forward for a moment to clear the obstruction,
then return agitation to reverse.
C. Fertilizer – Cut the fertilizer bag and dump contents into slurry tank.
D. All other additives – Consult with manufacturer for proper loading technique.
Keep hands and arms away from tank interior and agitator.
Failure to comply WILL result in serious personal injury or death.
Hydraulic system will overheat if agitator shaft is jammed for
extended period. This will damage hydraulic oil and system
components. Failure to comply could result in death or serious injury. Failure to comply
could also result in product or property damage.
8. When all materials are loaded, and the tank is full, move agitator to the NEUTRAL
position, then full speed FORWARD to ensure all materials are thoroughly mixed and
in suspension. It may be necessary to change the agitator direction more than once to
ensure a thorough mixture.
9. After material is thoroughly mixed, slow agitator in forward direction to 1/4 speed or just
enough to create movement in all of the corners of the tank. Do not over-agitate the slurry.
NOTE:
Always discharge material with the agitator control in the FORWARD
position.
10. Close the hatch lid on the slurry tank.
NOTE:
The slurry should not be recirculated for more than 15 minutes prior to
discharge to reduce wear and keep the seed from swelling. If foaming
occurs, reduce agitator speed.
Содержание HydroSeeder T30
Страница 4: ......