MY Series (10kVA-40kVA) UPS
User Manual
6 Use and Operation
87
6 Use and Operation
This chapter mainly describes the operation process, operation method, daily maintenance and
troubleshooting, etc.
6.1 Check Before Startup
Check if the wire connection is firm and the color of AC wires is in accordance with the
specification.
Check if UPS is grounded reliably.
Check if the voltage between the neutral wire and grounding wire is less than 5Vac.
If the UPS equipped with remote monitoring device, check if the wiring of the RS485 port is
correct.
If it is long backup model, check if the wiring between UPS and battery box is correct and
reliable.
Check if the wiring is neat and the wire binding is in accordance with the specification.
Check if the installation and wiring are good for transformation, expansion and maintenance in
future.
Check that there is no short-circuit in the output of the UPS and the load capacity isn't beyond the
rated capacity of the UPS.
6.2 Startup Operation
Step 1
Switch on the external mains, bypass and battery switch.
Step 2
After LCD/touch screen light on, press the "
" and "
" button (LCD) for 2s at the same time or
"ON" combination button (touch screen) for 1s at the same time on the front panel to start the UPS.
Step 3
About 10s later, if the UPS works steadily, start loads, such as PC, etc.
Содержание MY Series
Страница 1: ...User Manual MY Series 10kVA 40kVA UPS ...
Страница 2: ......
Страница 94: ...5 Touch Screen Operation MY Series 10kVA 40kVA UPS User Manual 86 Figure5 53 Confirm to turn off page ...
Страница 110: ...4402 02982 001 ...