1. Installation CPV−DI02 and CPV−CS02
1−26
Festo P.BE−CPV−DI02−EN en 0704NH
1
Cable
2
Strain relief
3
Housing
4
Connecting part
1
2
3
4
Fig.1/8:
Individual socket parts and cable routing
Preparing
When you have selected suitable cables, connect them as
follows (Fig.1/8):
1. Open the socket: Loosen the centre knurled nut.
2. Open the strain relief on the rear of the housing. Pass the
cable through.
3. Remove 5 mm of the insulation from the end of the cable
and fit core end sleeves.
4. Connect the conductors.
5. Replace the connecting part on the housing of the socket
and screw it tight. Pull the cable back so that there are no
loops inside the housing.
6. Tighten the strain relief.
Содержание PROFIBUD-DP
Страница 2: ......
Страница 15: ...Installation CPV DI02 and CPV CS02 1 1 Festo P BE CPV DI02 EN en 0704NH Chapter 1...
Страница 58: ...1 Installation CPV DI02 and CPV CS02 1 44 Festo P BE CPV DI02 EN en 0704NH...
Страница 59: ...Commissioning CPV DI02 PROFIBUS DP 2 1 Festo P BE CPV DI02 EN en 0704NH Chapter 2...
Страница 79: ...Diagnosis CPV DI02 PROFIBUS DP 3 1 Festo P BE CPV DI02 EN en 0704NH Chapter 3...
Страница 107: ...Commissioning CPV CS02 ABB CS31 4 1 Festo P BE CPV DI02 EN en 0704NH Chapter 4...
Страница 116: ...4 Commissioning CPV CS02 ABB CS31 4 10 Festo P BE CPV DI02 EN en 0704NH...
Страница 117: ...Diagnosis CPV CS02 ABB CS31 5 1 Festo P BE CPV DI02 EN en 0704NH Chapter 5...
Страница 131: ...Technical appendix A 1 Festo P BE CPV DI02 EN en 0704NH Appendix A...
Страница 146: ...A Technical appendix A 16 Festo P BE CPV DI02 EN en 0704NH...
Страница 147: ...Index B 1 Festo P BE CPV DI02 EN en 0704NH Appendix B...
Страница 148: ...B Index B 2 Festo P BE CPV DI02 EN en 0704NH Contents B Index B 1...
Страница 154: ...B Index C 8 Festo P BE CPV DI02 EN en 0704NH...