A. Technical appendix
A−12
Festo P.BE−CPV−DI02−EN en 0704NH
A.2.7
Bus parameters/reaction times
B
a
u
d r
a
te
(
k
B
a
u
d)
ma
x T
SDR
(T
B
it
)
m
in
T
SDR
(T
B
it
)
Ū
187.5
60
500
100
1500
150
11
3000
250
11
6000
450
12000
800
Tab.A/5:
Bus parameters and reaction times
A.2.8
Transmission times on the PROFIBUS−DP
No
te
Observe here the cycle time of your PLC and the update
time of the PROFIBUS−DP.
The time delay within the CP system depends on the amount
of data and therefore on the extension to the CP system.
It amounts to:
.
2 ms.
Please refer to the manual for your controller for ascertaining
the total time required for transmission.
Содержание PROFIBUD-DP
Страница 2: ......
Страница 15: ...Installation CPV DI02 and CPV CS02 1 1 Festo P BE CPV DI02 EN en 0704NH Chapter 1...
Страница 58: ...1 Installation CPV DI02 and CPV CS02 1 44 Festo P BE CPV DI02 EN en 0704NH...
Страница 59: ...Commissioning CPV DI02 PROFIBUS DP 2 1 Festo P BE CPV DI02 EN en 0704NH Chapter 2...
Страница 79: ...Diagnosis CPV DI02 PROFIBUS DP 3 1 Festo P BE CPV DI02 EN en 0704NH Chapter 3...
Страница 107: ...Commissioning CPV CS02 ABB CS31 4 1 Festo P BE CPV DI02 EN en 0704NH Chapter 4...
Страница 116: ...4 Commissioning CPV CS02 ABB CS31 4 10 Festo P BE CPV DI02 EN en 0704NH...
Страница 117: ...Diagnosis CPV CS02 ABB CS31 5 1 Festo P BE CPV DI02 EN en 0704NH Chapter 5...
Страница 131: ...Technical appendix A 1 Festo P BE CPV DI02 EN en 0704NH Appendix A...
Страница 146: ...A Technical appendix A 16 Festo P BE CPV DI02 EN en 0704NH...
Страница 147: ...Index B 1 Festo P BE CPV DI02 EN en 0704NH Appendix B...
Страница 148: ...B Index B 2 Festo P BE CPV DI02 EN en 0704NH Contents B Index B 1...
Страница 154: ...B Index C 8 Festo P BE CPV DI02 EN en 0704NH...