1. Installation CPV−DI02 and CPV−CS02
1−3
Festo P.BE−CPV−DI02−EN en 0704NH
1
.
1
G
ener
a
l
instructions
on
insta
ll
ation
Warnin
g
Before carrying out installation and maintenance work,
switch off the following:
the compressed air supply
the operating voltage supply for the internal logics
the load voltage supply for the valves.
You can thereby avoid:
uncontrolled movements of loose tubing
uncontrolled movements of the connected actuators
non−defined switching states of the electronic components.
Caution
The CPV valve terminal with field bus direct connection
(CPV Direct) contains electrostatically sensitive compo
nents.
Do not therefore touch any contacts.
Observe the handling specifications for electrostatic
sensitive devices.
You will then prevent the electronics from being damaged.
Содержание PROFIBUD-DP
Страница 2: ......
Страница 15: ...Installation CPV DI02 and CPV CS02 1 1 Festo P BE CPV DI02 EN en 0704NH Chapter 1...
Страница 58: ...1 Installation CPV DI02 and CPV CS02 1 44 Festo P BE CPV DI02 EN en 0704NH...
Страница 59: ...Commissioning CPV DI02 PROFIBUS DP 2 1 Festo P BE CPV DI02 EN en 0704NH Chapter 2...
Страница 79: ...Diagnosis CPV DI02 PROFIBUS DP 3 1 Festo P BE CPV DI02 EN en 0704NH Chapter 3...
Страница 107: ...Commissioning CPV CS02 ABB CS31 4 1 Festo P BE CPV DI02 EN en 0704NH Chapter 4...
Страница 116: ...4 Commissioning CPV CS02 ABB CS31 4 10 Festo P BE CPV DI02 EN en 0704NH...
Страница 117: ...Diagnosis CPV CS02 ABB CS31 5 1 Festo P BE CPV DI02 EN en 0704NH Chapter 5...
Страница 131: ...Technical appendix A 1 Festo P BE CPV DI02 EN en 0704NH Appendix A...
Страница 146: ...A Technical appendix A 16 Festo P BE CPV DI02 EN en 0704NH...
Страница 147: ...Index B 1 Festo P BE CPV DI02 EN en 0704NH Appendix B...
Страница 148: ...B Index B 2 Festo P BE CPV DI02 EN en 0704NH Contents B Index B 1...
Страница 154: ...B Index C 8 Festo P BE CPV DI02 EN en 0704NH...