1. Installation CPV−DI02 and CPV−CS02
1−34
Festo P.BE−CPV−DI02−EN en 0704NH
Ca
uti
o
n
The max. cable length between the CPV Direct and the last
CPI/CP module must not exceed 10 m.
The CP connecting cables must have special electrical
properties. Therefore always use Festo CP connecting
cables. An overview can be found in appendix A.
Ready−to−use CP connecting cables are available from Festo.
These are available in various lengths and designs.
Seal unused CP connections of your
CPsystem with the relevant seal pro
vided. In this way you will comply with
protection class IP65.
Содержание PROFIBUD-DP
Страница 2: ......
Страница 15: ...Installation CPV DI02 and CPV CS02 1 1 Festo P BE CPV DI02 EN en 0704NH Chapter 1...
Страница 58: ...1 Installation CPV DI02 and CPV CS02 1 44 Festo P BE CPV DI02 EN en 0704NH...
Страница 59: ...Commissioning CPV DI02 PROFIBUS DP 2 1 Festo P BE CPV DI02 EN en 0704NH Chapter 2...
Страница 79: ...Diagnosis CPV DI02 PROFIBUS DP 3 1 Festo P BE CPV DI02 EN en 0704NH Chapter 3...
Страница 107: ...Commissioning CPV CS02 ABB CS31 4 1 Festo P BE CPV DI02 EN en 0704NH Chapter 4...
Страница 116: ...4 Commissioning CPV CS02 ABB CS31 4 10 Festo P BE CPV DI02 EN en 0704NH...
Страница 117: ...Diagnosis CPV CS02 ABB CS31 5 1 Festo P BE CPV DI02 EN en 0704NH Chapter 5...
Страница 131: ...Technical appendix A 1 Festo P BE CPV DI02 EN en 0704NH Appendix A...
Страница 146: ...A Technical appendix A 16 Festo P BE CPV DI02 EN en 0704NH...
Страница 147: ...Index B 1 Festo P BE CPV DI02 EN en 0704NH Appendix B...
Страница 148: ...B Index B 2 Festo P BE CPV DI02 EN en 0704NH Contents B Index B 1...
Страница 154: ...B Index C 8 Festo P BE CPV DI02 EN en 0704NH...