4
Commissioning
28
Festo – P.BE-CPX-CTEL-EN – 1601b – English
Address assignment of the outputs (16 bytes):
Device
Device address
Output address CTEL
I-Port 1
(2 bytes)
Byte 0
Byte 0
Byte 1
Byte 1
–
Byte 2
–
Byte 3
I-Port 2
(unused)
–
Byte 4
–
Byte 5
–
Byte 6
–
Byte 7
I-Port 3
(4 bytes)
Byte 0
Byte 8
Byte 1
Byte 9
Byte 2
Byte 10
Byte 3
Byte 11
I-Port 4
(unused)
–
Byte 12
–
Byte 13
–
Byte 14
–
Byte 15
Legend: White = assigned; grey = unused
4.2
Procedure for commissioning
In order to avoid connecting and configuration errors, commissioning in steps is required.
Proceed as follows:
1. Check the CTEL master module and the connected I-Port devices
(
è
4.3 Preparing the CTEL system for commissioning).
2. Determine the required I/O configuration presetting (
è
3. If required: Parameterisation of the CTEL master module and the I-Port devices (
è
4. Check power supplies (
è
3.5 Connecting the power supply).
5. Commissioning of the entire system (
è
Description of the specific CPX bus node).
Содержание CPX-CTEL-4-M12-5POL
Страница 58: ......