4. Commissioning
4−12
Festo P.BE−CPV−EN en 0503g
Actuating the manual override with stop (locking)
Reaction of the valve
Press down the plunger of the
manual override as far as
possible.
The valve:
moves to the switching position
Leave the plunger in the lower
position.
remains in the switch position
Press the plunger of the manual
override into the upper position as
far as possible (basic position).
moves back to the basic posi
tion (
not with 5/2−way double−
solenoid valve, Ident. code J)
Tab.4/5:
Locking actuation of the manual override
Содержание CPV10
Страница 1: ...CPV pneumatics manual CPV valve terminal Type CPV VI Manual 165 200 en 0503g Compact performance...
Страница 2: ......
Страница 4: ...Contents and general instructions II Festo P BE CPV EN en 0503g...
Страница 16: ...Contents and general instructions XIV Festo P BE CPV EN en 0503g...
Страница 17: ...Sysytem summary 1 1 Festo P BE CPV EN en 0503g Chapter 1...
Страница 35: ...Fitting 2 1 Festo P BE CPV EN en 0503g Chapter 2...
Страница 60: ...2 Fitting 2 26 Festo P BE CPV EN en 0503g...
Страница 61: ...Installation 3 1 Festo P BE CPV EN en 0503g Chapter 3...
Страница 82: ...3 Installation 3 22 Festo P BE CPV EN en 0503g...
Страница 83: ...Commissioning 4 1 Festo P BE CPV EN en 0503g Chapter 4...
Страница 101: ...Maintenance and conversion 5 1 Festo P BE CPV EN en 0503g Chapter 5...
Страница 124: ...5 Maintenance and conversion 5 24 Festo P BE CPV EN en 0503g...
Страница 125: ...Technical appendix A 1 Festo P BE CPV EN en 0503g Appendix A...
Страница 136: ...A Technical appendix A 12 Festo P BE CPV EN en 0503g...
Страница 137: ...Summary of components B 1 Festo P BE CPV EN en 0503g Appendix B...
Страница 156: ...B Summary of components B 20 Festo P BE CPV EN en 0503g...
Страница 157: ...Index C 1 Festo P BE CPV EN en 0503g Appendix C...
Страница 158: ...C Index C 2 Festo P BE CPV EN en 0503g Contents C Index C 1...