Design and function
16
© Festo Didactic CP Factory / CP Lab ° application module drilling
4.5
Process description
Start Conditions
All connections have been made properly
Starting position
The cylinder of the drilling unit must be in its upper end position
The workpiece queries must be set correctly.
The cylinder of the sliding unit must be in the left end position
Procedure
1.
If a goods carrier with a workpiece is transported up to the stopper when the application is activated,
the goods carrier is stopped and an automatic sequence is started
2.
The workpiece is interrogated, there must be a front shell on the goods carrier, there must be no back
shell on the front shell, the position of the front shell must be correct in the goods carrier
3.
The drilling machines are switched on. Depending on the drill program, the X axis moves to the left.
4.
The drilling unit moves downwards and drills two holes into the lower housing part
5.
The drilling unit moves up again
6.
The X axis moves to the right position, depending on the drill program.
7.
The drilling unit moves downwards and drills the holes 3 and 4 into the lower housing part
8.
The drilling unit moves up again and the drilling machines are switched off
9.
Depending on the drill program, the X axis returns to its initial position
10.
The application program is finished, the stopper switches downwards and the goods carrier leaves the
station.
For parameters for the sequence, see chapter Operation.
Содержание CP Lab
Страница 1: ...Festo Didactic CP Factory CP Lab 06 2017 CP Factory CP Lab Manual application module iDrilling...
Страница 32: ...Operation 32 Festo Didactic CP Factory CP Lab application module drilling Automatic Mode sequence step 1 6...
Страница 33: ...Operation Festo Didactic CP Factory CP Lab application module drilling 33 Automatic Mode sequence step 7 12...
Страница 34: ...Operation 34 Festo Didactic CP Factory CP Lab application module drilling Automatic Mode sequence step 14...