Start up
30
© Festo Didactic CP Factory / CP Lab ° application module drilling
Requirements
–
Pneumatic port of the cylinders has been made.
–
Compressed air supply is switched on.
Procedure
1.
At first, turn off the two one-way control valves completely. Then turn them on again by about one
rotation.
2.
Start a test run.
3.
Turn on the one-way flow control valves slowly until the required piston speed has been reached.
Documents
Data sheets
One-way flow control valve (193138)
5.5
Visual inspection
Visual inspection must always be carried out before starting up!
Before starting the application module, please check:
the electrical connections
the correct fit and the condition of the compressed air supplies
the mechanic components regarding visible faults
(cracks, loose connections etc.)
the function of the Emergency-Stop settings
Please make sure that all damages discovered are removed before starting the application module!
Содержание CP Lab
Страница 1: ...Festo Didactic CP Factory CP Lab 06 2017 CP Factory CP Lab Manual application module iDrilling...
Страница 32: ...Operation 32 Festo Didactic CP Factory CP Lab application module drilling Automatic Mode sequence step 1 6...
Страница 33: ...Operation Festo Didactic CP Factory CP Lab application module drilling 33 Automatic Mode sequence step 7 12...
Страница 34: ...Operation 34 Festo Didactic CP Factory CP Lab application module drilling Automatic Mode sequence step 14...