Start up
© Festo Didactic CP Factory / CP Lab ° application module drilling
21
Mounting of the application module
With fillister-head screws M5x8, the mounting brackets of the application module are now connected to the
cross profiles, but not fastened yet. When all screws are placed, the application module can still be moved
to the position required. Please make sure that the workpieces can be transferred correctly like here at the
application module magazine. Once the position has been fixed, you only have to tighten the screws and to
put the covers on the mounting brackets.
Содержание CP Lab
Страница 1: ...Festo Didactic CP Factory CP Lab 06 2017 CP Factory CP Lab Manual application module iDrilling...
Страница 32: ...Operation 32 Festo Didactic CP Factory CP Lab application module drilling Automatic Mode sequence step 1 6...
Страница 33: ...Operation Festo Didactic CP Factory CP Lab application module drilling 33 Automatic Mode sequence step 7 12...
Страница 34: ...Operation 34 Festo Didactic CP Factory CP Lab application module drilling Automatic Mode sequence step 14...