NOTICE!
The safety functions STO and SBC are already available in the CMMT-AS as delivered, without addi-
tional parameterisation. Prior to initial commissioning, at a minimum connect the safety functions STO
and SBC.
1. Make sure that the overall safety function of the system is analysed and validated. It is the
responsibility of the operator to determine and verify the required safety rating (safety integrity
level, performance level and category) of the system.
2. Place CMMT-AS in operation and validate its behaviour in a test run.
Observe measures during integration of the PDS in accordance with standard EN ISO 13849-1 chapter
G.4:
–
Function check
–
Project management
–
Documentation
–
Performance of a black-box test
6.2
Check lists
The safety functions must be validated after installation and after every modification to the installa-
tion. This validation must be documented by the person who commissions the device. To assist you
with the commissioning, sample questions for risk reduction are summarised below in the form of
check lists.
The following check lists are no substitute for safety training. No guarantee can be provided for the
completeness of the check lists.
No.
Question
Relevant
Done
1.
Have all operating conditions and all means of intervention (possibil-
ity of intervening in the operation of the machine, but also physical
intervention in the machine) been taken into account?
Yes
o
No
o
o
2.
-Has the 3-step method for risk reduction been applied, i.e.: 1. Inher-
ently safe design, 2. Technical and possibly additional protective
measures, 3. User information about the residual risk?
Yes
o
No
o
o
3.
Have the hazards been eliminated or the hazard risks reduced as far
as practically possible?
Yes
o
No
o
o
4.
Can it be guaranteed that the measures put in place do not create new
hazards?
Yes
o
No
o
o
5.
Have the users been given sufficient information and warning regard-
ing the residual risks?
Yes
o
No
o
o
6.
Can it be guaranteed that the operators’ working conditions have not
been made worse due to the protective measures put in place?
Yes
o
No
o
o
Commissioning
27