DOMINA N 80
14
3.03 Drilling Template (Top Flue Application)
Select suitable mounting position for
boiler, using the template mark flue outlet
and boiler mounting points. Drill two
10mm holes 90mm deep to accept the
wall plugs, fit wall plugs. Fit two special
wall plugs on the wall as described in the
fig. 14a. Fasten the wall bracket to the
wall using an antitheft nut on the right
side and a standard nut (M8) on the left
side. Mount the boiler on the wall bracket
and fix using an antitheft nut on the
left side and a standard nut (M8) on the
right side. Using a core drill cut a 118mm
diameter hole for the flue.
1.
CH flow
2.
Safety Valve
3.
Domestic hot water outlet
4.
Gas supply
5.
Domestic hot water inlet
6.
CH return
Fig. 15b
Ø3/4"
Ø1/2"
Ø1/2"
Ø1/2"
Ø1/2"
Ø3/4"
200
Ø118
150 min
65
21 min
5 min
183 mi
n
295.5 mi
n
200 mi
n
932 mi
n
269
110
1 2 3
4
5
6
Fig. 15a
Содержание DOMINA N 80
Страница 12: ...DOMINA N 80 12 3 01 Boiler Mounting Plate 149 178 131 Fig 13 ...
Страница 49: ......
Страница 50: ......
Страница 51: ......