
DOMINA N 80
13
3.02 Drilling Template (Standard Rear Flue Application)
Select suitable mounting position for
boiler, using the template mark flue outlet
and boiler mounting points. Drill two
10mm holes 90mm deep to accept the
wall plugs, fit wall plugs. Fit two special
wall plugs on the wall as described in the
fig. 14a. Fasten the wall bracket to the
wall using an antitheft nut on the right
side and a standard nut (M8) on the
left side. Mount the boiler on the wall
bracket and fix using an antitheft nut on
the left side and a standard nut (M8) on
the right side.
Using a core drill cut a 118mm diameter
hole for the flue.
1.
CH flow
2.
Safety Valve
3.
Domestic hot water outlet
4.
Gas supply
5.
Domestic hot water inlet
6.
CH return
932 mi
n
178
200 mi
n
5 min
125 min
280
254.
5
295.5 mi
n
21 min
Ø118
183 mi
n
270
Ø 3/4"
Ø 1/2"
Ø 1/2"
Ø 1/2"
Ø 1/2"
Ø 3/4"
1 2 3
4
5
6
Fig. 14b
Fig. 14a
Содержание DOMINA N 80
Страница 12: ...DOMINA N 80 12 3 01 Boiler Mounting Plate 149 178 131 Fig 13 ...
Страница 49: ......
Страница 50: ......
Страница 51: ......