93
Rev. 1.1
T250A-T320A
ROUTINE MAINTENANCE
07-Checklist_new
7.2.2 Every 50 working hours or every month
►
Check the tension and efficiency of the transmission belts (where fitted)
►
Check the oil level of the tank or gearbox
►
Visually check the machine to identify the presence of any breakages or damage
►
Check that the heat exchanger is clean and free from debris or leaves
►
Check that the rotor bearings do not overheat during operation
Intervention date
Manager
Intervention date Manager
Содержание T250A right
Страница 2: ......
Страница 6: ...6 T250A T320A Rev 1 1 TABLE OF CONTENTS Page left intentionally blank INDICE...
Страница 68: ...68 T250A T320A Rev 1 1 ADJUSTMENTS Page left intentionally blank 05 Regolazione velocit di lavoro...
Страница 86: ...86 T250A T320A Rev 1 1 USE AND OPERATION 6 12 06 Lavoro su siepe 5 6 3 4 1 2 NO 7...
Страница 110: ...110 T250A T320A Rev 1 1 ROUTINE MAINTENANCE 7 8 07 Serraggio viti T460 15 Nm 20 Nm 10 Nm 10 Nm 10 Nm 15 Nm 20 Nm...
Страница 126: ...126 T250A T320A Rev 1 1 SCRAPPING AND DISPOSAL Page left intentionally blank 10 DEMOLIZIONE E SMALTIMENTO...
Страница 128: ...128 T250A T320A Rev 1 1 WARRANTY Page left intentionally blank 11 GARANZIA...
Страница 139: ...NOTES...