92
T250A-T320A
Rev. 1.1
ROUTINE MAINTENANCE
07-Checklist_new
7.2 Checklist
The Checklist serves to schedule all the maintenance operations and to monitor the frequency with which they are
performed in order to ensure the correct routine maintenance of the machine.
The manufacturer recommends keeping the original document attached to the instruction manual, and creating personal
copies for every authorised technician, to make a note of the interventions carried out on the machine.
7.2.1 Every 8 working hours or daily
►
Check that screws and nuts are tightened
►
Check that the tools are not worn and are intact
►
Check that the accident prevention protections are intact
►
Grease pins, bearings, universal joints and PTO shaft telescopic barrel, etc.
Содержание T250A right
Страница 2: ......
Страница 6: ...6 T250A T320A Rev 1 1 TABLE OF CONTENTS Page left intentionally blank INDICE...
Страница 68: ...68 T250A T320A Rev 1 1 ADJUSTMENTS Page left intentionally blank 05 Regolazione velocit di lavoro...
Страница 86: ...86 T250A T320A Rev 1 1 USE AND OPERATION 6 12 06 Lavoro su siepe 5 6 3 4 1 2 NO 7...
Страница 110: ...110 T250A T320A Rev 1 1 ROUTINE MAINTENANCE 7 8 07 Serraggio viti T460 15 Nm 20 Nm 10 Nm 10 Nm 10 Nm 15 Nm 20 Nm...
Страница 126: ...126 T250A T320A Rev 1 1 SCRAPPING AND DISPOSAL Page left intentionally blank 10 DEMOLIZIONE E SMALTIMENTO...
Страница 128: ...128 T250A T320A Rev 1 1 WARRANTY Page left intentionally blank 11 GARANZIA...
Страница 139: ...NOTES...