background image

mr

.

steam

®

C L U B T H E R A P Y

Installation, Operating & Maintenance Manual

_________________________________________________________________________________________

3

If acrylic, fiberglass or other non-heat resistant materials are

used as part of the steam room enclosure. Consult with the material manu-
facture and see pg. 7, “Installing the AromaSteam Steamhead" for addition-
al details.

IMPORTANT NOTES:

This document contains important safety, operation and maintenance infor-
mation. Leave this document with the club/spa management.
Do not discard this document.

The following general information should be used in conjunction with con-
sultations with an architect, designer and contractor in determining factors
necessary in providing a suitable and safe steam room.

MrSteam CT steam generators are intended to be operated with MrSteam’s
iTempo/Plus

, iSteam

®

and CT SteamStop

®

only, and are to be installed

strictly in accordance with the specific instructions contained in this manual
and as supplied in the manuals provided with the controls or accessories.

Never use damaged equipment, doing so may

result in an inoperative or hazardous installation.

Discontinue use of the steam generator and control if the steam
generator or control are damaged or otherwise not functioning
properly. Doing so may result in an inoperative or hazardous
installation

ELECTRICAL SHOCK HAZARD. MrSteam steam generators are
connected to 208V or 240V line voltage and contain live electri-
cal components. All installation and service to be performed by
qualified and licensed electricians and plumbers only. nstallation
or service by unqualified persons or failure to use MrSteam parts
may result in property damage or in a hazardous condition.

Do Not alter or modify any MrSteam product.

Doing so may result in an inoperable or hazardous
installation and will void the warranty

8. Steam room tile construction information is available from the Tile

Council of America, Inc. by purchasing
the TCA Handbook for Ceramic Tile Installation.at (864) 646-8453
or www.tileusa.com.

9. Windows that are part of the steam room should be double

paned and tempered safety glass.

10. Limit steam room ceiling height to 8 feet. Exceeding 8 feet may

require a higher-rated steam generator.

The warning

placard is located in the docu-
mentation envelope. This plac-
ard is an essential part of provid-
ing a safe environment for steam
room users. This placard must be
mounted to the wall of the
shower or steam enclosure, at a
point visible to all users. Failure
to mount this placard may result
in serious injury or death. For a
replacement placard contact
MrSteam customer service at 1-
800-76-STEAM or
[email protected]

Before Installing

Carefully inspect the CT steam generator and packaging for
shipping damage. In the event of shipping damage, please
contact the carrier for claim information. Our customer service
department can assist you with any missing or damaged parts.

Read these instructions before installation or service. Although
this CT steam generator has been fully qualified
for shipment by MrSteam, the following must be reviewed for
proper, safe and enjoyable steam bathing:

1. Verify that the model and accessories specifications are cor-

rect for the incoming line voltage.

2. Insure steambath generator has been correctly sized for the

steambath room. Pay particular attention to room volume

Steam Room Guidelines

IMPORTANT NOTE:

Owners/Operators should obtain a

copy and familiarize themselves with the latest edition of the
American College Sports Medicine Health/Fitness Facility
Standards and Guidelines, or a similar resource and reference
publication, and refer to those guidelines for the proper and
safe operation of a spa facility including steam rooms.

1. Steam room must be completely enclosed, with full

walls, door, floor and ceiling.

2. It is recommended that a gasketed door is used for

steam containment.

3. If tile-type or other smooth surfaced flooring is used

provide suitable anti-skid strips or equivalent, to
prevent a slipping hazard.

4. Check the suitability of any materials with the

manufacturer. Walls and ceilings must be constructed
of water-resistant, non-corrosive surface, such as tile,
marble, molded acrylic, or other non-porous material.

5. The ceiling should be sloped to prevent dripping of

condensate.

6. Provide a floor drain.
7. No heating, venting or air conditioning devices

should be installed inside the steam room.

and construction. If any questions, please refer to MrSteam sizing
and selection guide on page 2.

3. Marble or glass walls or ceilings “enlarge” the room’s size requir-

ing a generator larger than one based only on the room’s cubic
foot (L x H x W) volume.

4. The physical size of the unit, clearance for plumbing servicing,

and its distance from the steam room must all be considered
before final installation.

5. Consider any controls and accessories before initiating installa-

tion. Read the Installation & Operation Manual of all controls
and accessories available at
www.mrsteam.com/products/technical-downloads.html

STEAM ROOM BENEFITS

Steam bathing is a communal activity. Enjoy steam together with friends. Relax, knowing
that steam may be a natural detox. Here are some possible benefits of steam bathing:

- Cleanses, nourishes, and hydrates skin

- Boosts metabolism

- Provides relief for respiratory ailments such as colds, flu, allergies, and asthma

- Reduces stress and promotes restful sleep

Follow your steambath with a refreshing shower.

If you would like your own personal steam bath at home contact us at mrsteam.com

REDUCE THE RISK OF OVERHEATING AND SCALDING

1. Exit immediately if uncomfortable, dizzy or sleepy. Staying too long in a

heated area is capable of causing overheating.

2. Children under the age of 16 should not use the steam bath.
3. Check with a doctor before use if pregnant, diabetic, in poor health or

under medical care.

4. Breathing heated air in conjunction with consumption of alcohol, drugs or

medication is capable of causing unconsciousness.

5. Do not contact steam head or steam at the steam head.

REDUCE THE RISK OF SLIPPING AND FALL INJURY

Use care when entering or exiting the steam room, floor may be slippery.

Note:

For additional safety considerations see owner's manual.

MrSteam 43-20 34th Street, Long island City NY 11101 1-800-76-STEAM www.mrsteam.com

Not Actual Size

Содержание mr. steam Club Therapy CT6E

Страница 1: ...mr steam Feel Good Inc Club Therapy Steambath Generator Systems Installation Operation Maintenance Manual Models CT6E CT9E CT12E CT15E Installation Operation Maintenance Manual...

Страница 2: ...ical Specifications Field Power Wiring 9 Wiring Diagrams 10 Initial Start Up Checkout Maintenance Generator Operations and Troubleshooting 11 System Status Codes Liquid Level Control Board 12 AutoFlus...

Страница 3: ...blood pressure and circulation A warning placard has been provided in the Information envelope This placard is an essential part of providing a safe environment for steam room users This placard must...

Страница 4: ...to be installed inside the steam room when the control is mounted outside the steam room Steam Generators Specification Chart Amps for Total Adj Wire Water Usage Shipping Model No KW 240v 1PH Room Vo...

Страница 5: ...r shipment by MrSteam the following must be reviewed for proper safe and enjoyable steam bathing 1 Verify that the model and accessories specifications are cor rect for the incoming line voltage 2 Ins...

Страница 6: ...rovide supports under steam generator when wall mounting Keyhole slots are provided for wall mounting Insure the steam generator is properly secured and level when mounting with keyhole slots 6 Instal...

Страница 7: ...formation Remote Sensor see page 16 CT SteamStop Control See page 17 for installation information iTempo Plus or iSteam Control See page 16 Field installed water supply line IMPORTANT Locate the remot...

Страница 8: ...on Manual for installation information before the steam piping is installed at www mrsteam com technical downloads Steam Piping 1 2 NPT 1 Do not install any valve in steam piping Flow of steam must be...

Страница 9: ...is finished STEP 4 After the wall has been finished mark on the nipple where the surface of the wall is Remove the nipple and measure the por tion that was in the wall the end to your mark Subtract 1...

Страница 10: ...inches MM Water Inlet Steam Outlet Safety Valve AutoFlush Manual Drain Valve Generator Dimensions IMPORTANT NOTES Provide a minimum of 12 inches at both ends and top of the steam generator or as requi...

Страница 11: ..._ 208 1 29 8 8 CT6E 150 6 0 3 17 10 10 240 1 25 8 8 3 14 12 12 ___________________________________________________________________________ 208 1 44 8 6 CT9E 360 9 0 3 25 8 8 240 1 38 8 8 3 22 10 10 __...

Страница 12: ...T GRAY WHT BLUE RED WHT RED Remove Jumper when CU HTC is installed CONTROL BOARD CONTACTOR Heating Element To Probe AutoFlush CT SteamStop iTempo Plus or iSteam Control TRANSFORMER POWER INPUT L1 L2 F...

Страница 13: ...from enclosure area turn shower on before opening door 4 If unit does not start and control does not turn ON control display does not light up then turn breaker off for 20 seconds and try again 5 Ref...

Страница 14: ...rol Board EXPLANATION OF LED INDICATORS _____________________________________________________________________________________________________________________________________________ GREEN LED is ON wh...

Страница 15: ...Open Drain Valve handle must be aligned with brass nipple 4 Connect the AutoFlush System cord connector to the three pin connector as shown Do not drain into a steam enclosure or any location where ac...

Страница 16: ...oses not related to component identification Replacement Parts List ____________________________________________________________ Part No Description Product ___________________________________________...

Страница 17: ...r or other purposes not related to component identification 15 Transformer Drain Line Liquid Level Control Board Fuses Water Inlet Water Feed Solenoid Safety Valve AutoFlush Valve Stainless Steel Tank...

Страница 18: ...le length is 30 feet Insure that the control and or steam generator are located according ly An optional 60 foot cable is available PN 103990 60 for iTempo and PN 104117 60 for iSteam Contact a MrStea...

Страница 19: ...sket The connector is keyed and will only connect in one orientation with the tab facing up LED indicator will light up when the generator is ON Using the CT SteamStop Control The CT SteamStop control...

Страница 20: ...meWizard iButler iGenie iSizing iSteam iTempo iTempo Plus Making Wellness a Way of Life Music Therapy Spa Package Steam Genie Steam on Demand Steam Home SmartSizing SteamStart SteamStop SteamTherapy S...

Отзывы: