RECOMMENDATIONS 

RECEIVING: 

Immediately  upon  receipt  of  the 

shipment, inspect and check with the packing list 
and  report  to  the  transportation  company’s  local 
agent  of  any  damage  or  shortage.  Inspect  carton 
and  wrappings  before  discarding.  Parts  and 
accessories 

may 

sometimes 

be 

wrapped 

individually and packed in the carton. Should you 
find  the  plastic  wrapping  removed  or  damaged 
upon  the  arrival  of  the  equipment,  note  the 
incident on the carrier’s Bill of Lading.  

 
STORAGE: 

The  plastic  wrapping  is  not  meant  as 

mean  to  protect  the  equipment  from  the 
environment  during  storage.  If  the  pump  is 
received  sometime  in  advance  of  when  it  can  be 
put into use, it should be inspected, rewrapped or 
re-boxed and stored in a dry location. If the pump 
is to be stored for a long period of time, rotate the 
pump  shaft  periodically  to  protect  the  bearings. 
Units  should  not  be  stored  where  temperatures 
will be below 20˚F or above 100˚F. 

 

 

CONTROLS: 

3 Phase, pump only, and non-115Volt 

pump  models  require  a separate  approved pump 
control  device  or  panel  for  automatic  operation. 
Be  sure  that  the  electrical  specification  of  the 
control  selected  properly  match  the  electrical 
specifications of the pump.  
 

SUBMERGENCE:

  The  pump  should  always  be 

operated  in  the  submerged  condition.  The 
minimum  liquid  level  should  never  be  less  than 
above  the  pump’s  volute.  The  recommended 
liquid  level  would  be  the  height  of  the  pump  to 
assist with motor cooling. 
 
 

VENT  HOLE:

  The  discharge  piping  of  the  pump 

should always be drilled with a vent hole(⅛”Ø) at 
a  height  of  6”  above  the  pump  discharge  to 
prevent air locking. 
 
 
 
 
 

 
 

•••••••••••••• 

Содержание BGP Series

Страница 1: ...i IMPORTANT READ ALL INSTRUCTIONS IN THIS MANUAL BEFORE OPERATING AND SERVING A PUMP...

Страница 2: ...ntained properly Sewage pumps provide for the lifting and disposal of sewage and sewage related fluids from retaining basins or concrete pits and are pumped to city water disposal lines where these fl...

Страница 3: ...NSURE EMPLOYEES WILL NOT BE EXPOSED TO HEALTH HAZARDS IN HANDLING SAID MATIERAL ALL APPLICABLE LAWS AND REGULATIONS SHALL APPLY IWARNING Installation wiring and junction connections must be in accorda...

Страница 4: ...alled in locations classified as hazardous in accordance with the National Electric Code ANSI NFPA 70 IWARNING The Uniform Plumbing Code UPC states that sewage systems shall have an audio and visual a...

Страница 5: ...or re boxed and stored in a dry location If the pump is to be stored for a long period of time rotate the pump shaft periodically to protect the bearings Units should not be stored where temperatures...

Страница 6: ...lled in a trench ditch or hole with a dirt bottom The legs will into the dirt and the suction will become plugged adequate working space A minimum of 8 diametrical clearance around the tank is recomme...

Страница 7: ...unded DO NOT USE THE POWER CABLE TO LIFE PUMP Do not use an extension cord for 1 Phase pump s Always wire the pump as indicated on the wiring diagram inside the control panel 2 OVERLOAD PROTECTION On...

Страница 8: ...ches SW1 SW2 SW3 and 1 high water alarm switch SW4 mounted to the style 1 pilot device with a duplex control panel The level control and high water alarm float should have adequate clearance so they c...

Страница 9: ...he motor before the pump is put into service The resistance values voltage and current should be recorded 5 PUMP DOWN TEST Be sure pump has been properly wired lowered into the basin or lift station C...

Страница 10: ...e any 2 of 3 power supply leads on the motor end of the starter or VFD to ensure proper impeller rotation 11 Repair fixtures as required to eliminate leakage 12 Check pump temperature limits and fluid...

Страница 11: ...e 5 COOLING OIL INSPECTION Anytime the pump removed from operation the cooling oil in the motor housing should be checked visually for oil level and contamination To check oil set unit upright remove...

Страница 12: ...d PRESSURE TEST AIR FILL MOTOR Remove pipe plug from housing Apply pipe sealant to pressure gauge assembly and tighten into hold Pressurize housing to 10 PSI Use soap solution around the sealed areas...

Страница 13: ...g with washers and grommet d Pull cord through and disconnect the wires from the terminals on power cord Be sure to note wire connections for reassembly e Disconnect cable leads from motor leads and r...

Страница 14: ...ate the impeller by hand and check for smooth rotation If rotation is not smooth check for alignments in the bearing and scratches on the seal faces 2 Upon completion of reassembly rotate the impeller...

Страница 15: ...15 NOTES...

Страница 16: ...l apply to the equipment supplied hereunder or referred to herein or to its performance all such other warranties including any warranty of merchantability or fitness for any purpose being hereby disc...