8.
9.
Remove the flange (2).
10.
Remove cylinder roller bearing 1
Fig. 233 from the flange.
6.3.1.4
Assembling the vibratory drum
1.
Fill approx. 15 g of lithium saponified high
pressure grease into the gap between the
rolling elements and approx. 15 g into the
grease chamber of the bearing flange.
Cool the new cylinder roller bearing 1
-25°C, press it into the bearing flange until it bottoms and fill it
with high pressure grease.
S-834-0028
1
2
Fig. 232
S-834-0029
1
Fig. 233
Assembling / installing the exciter
shaft
Fig. 234
Machine assemblies – Drum
BW 900-50
186
Go
to
Discount-Equipment.com
to
your
parts