1.
Block the drums with suitable chocks
2.
Pull up the parking brake lever
3.
Connect 600 bar pressure gauges
sure test ports M
A
and M
B
.
4.
Close high pressure ports M
A
and M
B
with plugs.
Fig. 113
Fig. 114
Fig. 115
Hydraulic system – Tests and adjustments
BW 900-50
126
Go
to
Discount-Equipment.com
to
order
your
parts