![Fayat BOMAG BW 124 PDH-5 Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/fayat/bomag-bw-124-pdh-5/bomag-bw-124-pdh-5_operating-instruction-maintenance-instruction_546857010.webp)
1.1
Foreword
BOMAG manufactures machines for earth,
asphalt and refuse compaction, stabilizers/
recyclers as well as planers and pavers.
BOMAG’s vast experience in connection
with state-of-the-art production and testing
methods, such as lifetime tests of all impor-
tant components and highest quality
demands guarantee maximum reliability of
your machine.
These operating and maintenance instructions
are part of your machine.
They provide necessary information to operate
your machine safely and properly.
They also contain information on required oper-
ating, maintenance and repair measures.
Carefully read the operating and maintenance
instructions before taking your machine into
operation.
Please observe the safety regulations strictly
and follow all instructions to ensure safe opera-
tion.
If you are not yet acquainted with the controls
and indicating elements on this machine, you
should thoroughly read the corresponding
Chapter 4 „Indicators and control
The description of the individual operating
steps including the notes on safety to be fol-
lowed can be found in chapter “Operation”
Chapter 6 „Operation“ on page 95
Before every start up, carry out all required
visual inspections and function tests
5 „Checks prior to start up“ on page 81
Ensure the compliance with the specified oper-
ating, maintenance and repair measures to
maintain the functional safety of your machine.
Introduction – Foreword
BW 124 PDH-5
10
Содержание BOMAG BW 124 PDH-5
Страница 9: ...1 Introduction Introduction BW 124 PDH 5 9 ...
Страница 13: ...2 Technical data Technical data BW 124 PDH 5 13 ...
Страница 18: ...Technical data Noise and vibration data BW 124 PDH 5 18 ...
Страница 19: ...3 Concerning your safety Concerning your safety BW 124 PDH 5 19 ...
Страница 69: ...4 Indicators and control elements Indicators and control elements BW 124 PDH 5 69 ...
Страница 81: ...5 Checks prior to start up Checks prior to start up BW 124 PDH 5 81 ...
Страница 86: ...6 Push the dipstick in Checks prior to start up Checking the engine oil level BW 124 PDH 5 86 ...
Страница 92: ...3 Close the cap Checks prior to start up Checking the coolant level BW 124 PDH 5 92 ...
Страница 95: ...6 Operation Operation BW 124 PDH 5 95 ...
Страница 118: ...Operation Emergency procedures BW 124 PDH 5 118 ...
Страница 119: ...7 Loading transporting the machine Loading transporting the machine BW 124 PDH 5 119 ...
Страница 127: ...8 Maintenance Maintenance BW 124 PDH 5 127 ...
Страница 195: ...9 Troubleshooting Troubleshooting BW 124 PDH 5 195 ...
Страница 204: ...Troubleshooting Trouble shooting ECONOMIZER BW 124 PDH 5 204 ...
Страница 205: ...10 Disposal Disposal BW 124 PDH 5 205 ...
Страница 207: ...11 List of special tools List of special tools BW 124 PDH 5 207 ...
Страница 208: ...List of special tools BW 124 PDH 5 208 ...
Страница 209: ......