
Machine description
4812159901_D.pdf
2023-01-25
Main fuse panel (Deutz)
2
Fig. Main fuse panel
1. Master switch
2. Preheating relay (100A)
3. Starter relay
4. Power socket 24V
5. Fuse box (F4)
4
5
1
3
The main fuse panel is located behind the left engine
compartment door.
Fuse box at master switch (Deutz)
Fig. Fuse box, master switch
1
3
2
4
The figure shows the position of the fuses.
The table below gives fuse amperage and function. All
fuses are flat pin fuses, type E (high).
F4
Fuse box
F4
Fuse box
F4.1.
Main fuse
50A
F4.1.
Main fuse
50A
F4.2.
Cab
50A
F4.2.
Cab
50A
F4.3.
Preheating relay
100A
F4.3.
Preheating relay
100A
F4.4.
Diesel engine ECU
30A
F4.4.
Diesel engine ECU
30A
60
Содержание DYNAPAC CC234C
Страница 2: ......
Страница 13: ...4812159901_D pdf 2023 01 25 1...
Страница 14: ...4812159901_D pdf 2023 01 25 2...
Страница 18: ...Introduction 4812159901_D pdf 2023 01 25 6...
Страница 28: ...Special instructions 4812159901_D pdf 2023 01 25 16...
Страница 46: ...Machine description 4812159901_D pdf 2023 01 25 4812129673 Warning CALIFORNIA Proposition 65 34...
Страница 74: ...Machine description 4812159901_D pdf 2023 01 25 62...
Страница 94: ...Operation 4812159901_D pdf 2023 01 25 82...
Страница 108: ...Preventive maintenance 4812159901_D pdf 2023 01 25 96...
Страница 128: ...Maintenance 10h 4812159901_D pdf 2023 01 25 116...
Страница 132: ...Maintenance 50h 4812159901_D pdf 2023 01 25 120...
Страница 146: ...Maintenance measures 500 h 4812159901_D pdf 2023 01 25 134...
Страница 173: ......
Страница 174: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden www dynapac com...