
3.
Set the throttle lever to position "MIN".
4.
After approx. 30 to 40 seconds read the idle speed from the
existing engine rpm-meter .
5.
Set the throttle lever to position "MAX".
6.
After approx. 30 to 40 seconds read the max. speed from the
existing engine rpm-meter .
7.
If necessary adjust the idle speed or maximum speed as
required.
Fig. 71
Fig. 72
Fig. 73
Maintenance – Annually
BVT 65
81
Go to
Discount-Equipment.com
to
order your parts