28
Program example
Absolute displacement
Absolute displacement takes its reference point from the program’s home position.
In this case to make three CCW rotations the instruction is given to go to the 4 000 line
position. In other words, to “return” to the 4 000 line position, the motor has to go back
6 000 lines from its actual position at 10 000 lines.
Waiting time
The 2 second waiting time is simply defined using the WAIT TIME instruction.
Writing the program
Now that all the phases have been defined, the final instructions are entered in the
PROGRAM menu in the correct sequence. (See “input sequence” above).
Specifications subject to change without notice