![Faster GLOVEFAST ASEPTIC Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/faster/glovefast-aseptic/glovefast-aseptic_operating-and-maintenance-manual_3574741023.webp)
a D:GROUP Company
0254EN
– Rev. 06 – 09/2019
Page 23 of 65
7.D HOW INTRODUCE MATERIAL
To introduce material in the isolator, it is necessary use the pass boxes mounted on both sides of the
isolator.
The pass boxes have two timed doors electrical interlocked. To open the external doors you have to push
the button installed on the control panel:
To introduce material in the isolator follow this steps:
1. Push the button on the control panel (with this action you open the external door of the relevant pass
box)
2. Open the external door.
3. When the external door is open it is not possible to open the internal door.
4. Introduce the material in the pass box.
5. Close the external door.
6. After a prestabilished time (cleaning cycle) it is possible press the footswitch to open the internal
door.
7. When the internal door is open the external door is locked.
8. Introduce the material in the working chamber and close the internal door.
9. When the internal door is closed, after the pre-set time, all the doors are again unlocked.
To exit material, follow the opposite procedure.
When a door is opened and closed there is a pre-set time to wait before open the next door (default value is
10 sec and can be changed entering the service mode). During this time the object in the pass boxes are
decontaminated with a shower of clean air.
During the isolator installation the timer is manually settable by the control panel, in order to allow the pass
box air to be clean before opening the second door.
Содержание GLOVEFAST ASEPTIC
Страница 9: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 9 of 65...
Страница 26: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 26 of 65 1 2...
Страница 46: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 46 of 65...
Страница 48: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 48 of 65 15 J DIAGRAM FOR MAINTENANCE OPERATIONS...
Страница 49: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 49 of 65 16 FRONTAL DIAGRAM...
Страница 50: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 50 of 65 16 A SIDE DIAGRAM...
Страница 54: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 54 of 65 18 WIRING DIAGRAM...
Страница 55: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 55 of 65...
Страница 56: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 56 of 65...
Страница 57: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 57 of 65...
Страница 58: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 58 of 65...
Страница 59: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 59 of 65...
Страница 60: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 60 of 65...
Страница 61: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 61 of 65...
Страница 62: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 62 of 65...
Страница 63: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 63 of 65...
Страница 64: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 64 of 65...