background image

GB

 

 

PLACING OF THE INSERT

 

Make  sure  that  the  couple  tie-rod/head  mounted  on  your  riveting  tool  is  suitable  for  the  insert  to  clamp;  otherwise, 
change size accordingly. Usually the riveting tool is supplied with the couple tie-rod/head corresponding to a 

M8

 thread. 

Before  using  the  riveting  tool  and  after  any  change  of  size,  perform  the  following  operations  according  to  the  size  and 
thickness of the part to clamp. Adjust the riveting tool stroke to the minimum by turning the ring nut “

G

” to “–” marked on 

the tool. Place the insert on the tie rod and push slightly on it so as to make it clamp automatically. Make sure the insert 
head touches the riveting tool head properly. Fasten the insert and in order to ensure a proper clamping of the material, 
adjust the riveting tool stroke by tur

ning the ring nut “

G

” accordingly. By increasing stroke, i.e. by turning the ring nut “

G

” 

to “+”, the distance “

h

” between head and insert deformation will decrease and clamping will result more effective.

 

 
 

WARNING!!! A WRONG ADJUSTMENT OF THE RIVETING TOOL STROKE

 

 

MAY CAUSE A FAULTY CLAMPING OF INSERTS AND MAY BRAKE THE TIE ROD!

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

G

 

 

 

 

 

 

 

 

 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

 +

 

 

 

Revisione - 18

 

Date 01-2012                                                                    

9

Содержание KJ 60

Страница 1: ...I 3 8 GB TRANSLATION OF ORIGINAL INSTRUCTIONS OIL PNEUMATIC RIVETING TOOL FOR INSERTS M3 M8 INSTRUCTIONS FOR USE SPARE PARTS...

Страница 2: ...nsability that the riveting machine Type KJ 60 Hydropneumatic tool Application for threaded inserts M3 M8 which is the object of this declaration complies with the basic safety requirements estabilish...

Страница 3: ...RU 3 GB INSTRUCTIONS FOR USE 7 RU 12 GB SPARE PARTS 13 PL...

Страница 4: ...9 9 10 10 10 10 11 12 13 13 FAR 12 FAR S r l FAR s r l FAR s r l CEE 85 374 http www far bo it Organization 70 dB A FAR KJ 60 Revisione 18 Date 01 2012 3...

Страница 5: ...KJ 60 KJ 60 KJ 60 M3 M8 KJ 60 A B C D E F G H I L M N 6 8 9 6 13656N 2 212 5 50 C Ac 2 5 m s2 A 70 dBA C 130 dBC A 88 dBA 4 Date 01 2012 Revisione 18...

Страница 6: ...M8 G G G h G Revisione 18 Date 01 2012 5...

Страница 7: ...1 25 2 3 4 1 2 25 mm 3 4 25 6 Date 01 2012 Revisione 18...

Страница 8: ...ailable on our website http www far bo it Organization The tool must be used only by expert workers A protective visor and gloves must be put on when using the tool For topping up the oil we suggest u...

Страница 9: ...d by some sealed gaskets which solve this problem MAIN COMPONENTS A Threaded tie rod B Head C Ring nut clamping head D Tensile strength pushbutton E Unscrewing pushbutton F Insertion Pin Hole Dechucki...

Страница 10: ...turning the ring nut G to marked on the tool Place the insert on the tie rod and push slightly on it so as to make it clamp automatically Make sure the insert head touches the riveting tool head prop...

Страница 11: ...order to dechuck the tie rod clutch at the same time unscrew the tie rod and extract it PICTURE 3 4 Keep the clutch dechucked and screw the tie rod size desired When the replacement of the tie rod ha...

Страница 12: ...and while keeping the riveting tool in a horizontal position unscrew and close up the container X and the plug A WARNING it is very important to follow the about mentioned instructions and use gloves...

Страница 13: ...36 711796 1 60C 710537 1 4 x 12 UNI 6873 37 711797 1 KIT D 741705 38 711798 1 20D 711705 2 39 711799 1 59D 711726 3 2 x 20 UNI 1707 40C 711800 1 C KIT E 741792 41 711801 1 32E 711792 1 42C 711802 1 C...

Страница 14: ...connector 42C 711802 1 Clutch for tie rod 36 711796 1 Shaft 60C 710537 1 Spring pin 4 x 12 UNI 6873 37 711797 1 Milled sleeve KIT D 741705 Push button Kit 38 711798 1 Stroke adjusting nut 20D 711705...

Страница 15: ...29 33 6 32 E 31 30 99 E 63 E 85 62 26 62 22 61 61 73 79 64 80 17 18 70 74 78 16 A 56 59 D 81 71 19 86 55 5 23 1 72 A 83 20 D 98 10 7 16A x2 KIT D 77 84 4 59D x3 15 72A x2 9 20D x2 75 KIT A 88 87 89 9...

Страница 16: ...SPARE PARTS F002 7 6 5 4 3 15 2 14 13 9 1 12 11 20 10 19 9 8 18 17 16 KIT A Revisione 18 Date 01 2012 15...

Страница 17: ......

Страница 18: ......

Страница 19: ...www far bo it Organization FASTENING SYSTEMS HEAD OFFICE WAREHOUSE 40057 Quarto Inferiore Bologna Italy 20099 Sesto San Giovanni Via Giovanni XXIII 2 Milano Tel 39 051 6009511 Italy Ufficio Vendite F...

Отзывы: