
Rev.10
52/212
Group
Status
52
Circuit breaker supervision
52 Start
52 Error
52 Open
52 Opening time
52 Opening fault
52 Closed
52 Closing time
52 Closing fault
52 Excessive openings
52 Excessive openings in a time window
52 a Status
52 b Status
Manual close
BF
Breaker failure
BF Pickup
BF Trip
74TCS
Trip circuit supervision
74TCS Pickup
74TCS Alarm
79
Recloser
79 Standby
79 Reclosing time
79 Open
79 Hold time
79 Closing time
79 Reset time.
79 Lock out
79 Safety time
79 Final opening time
79 Enabled
Содержание SIL-V
Страница 7: ...www fanox com Rev 10 7 212 2 DIMENSIONS AND CONNECTION DIAGRAMS 2 1 Equipment front view...
Страница 8: ...www fanox com Rev 10 8 212 2 2 Equipment dimensions...
Страница 9: ...www fanox com Rev 10 9 212 2 3 Cut out pattern...
Страница 11: ...www fanox com Rev 10 11 212 3 VT configuration phase neutral...
Страница 12: ...www fanox com Rev 10 12 212 3 VT configuration phase neutral residual voltage SILVxxxx0xxxxx...
Страница 13: ...www fanox com Rev 10 13 212 3 VT configuration phase neutral busbar voltage SILVxxxx2xxxxx...
Страница 14: ...www fanox com Rev 10 14 212 3VT configuration phase phase residual voltage...
Страница 15: ...www fanox com Rev 10 15 212 2VT configuration phase phase residual voltage...
Страница 17: ...www fanox com Rev 10 17 212 2 5 Terminals...
Страница 25: ...www fanox com Rev 10 25 212 3 3 Functional Diagram...
Страница 192: ...www fanox com Rev 10 192 212...
Страница 210: ...www fanox com Rev 10 210 212 12 9 Comments Person in charge of commissioning Date Maintenance performed on the by...
Страница 211: ...www fanox com Rev 10 211 212 NOTES...
Страница 212: ...www fanox com Rev 10 212 212...