ISO 9001:2008
www.fanox.com
SIAC116B1011AB_Rev. 05
3 / 32
1.
RECEPTION & INSTALLATION
1.1.
Relay unpacking
Previously to any handling action, confirm that relay carton box is in good conditions, no
broken or damaged due to external manipulation or during storing or moving process. If
packing is correct, proceed to unpack and you should find following element:
•
SIAC Electronic protection relay.
•
User Guide.
•
Testing protocol.
Testing protocol is a certificate that relay has passed all factory testing process with
correct results.
In case some fault is detected, consider to put into quarantine period the relay and contact
Fanox for further instructions.
1.2.
Relay verification
When relay is unpacked, please, take your time to confirm following checking list to be
sure that everything is ok:
•
Metallic case not damaged and well assembled. No loose screws due to transport or
movement conditions
•
LCD and front cover not damaged or scratched.
•
Quality sticker and terminal sticker correctly stuck.
•
Rear terminals in good state, being able to do a good wiring connection.