INSTALLATION
Check the appliance is electrically safe and gas sound when you have finished.
29
Final Checks
Note:
The clock must be set before the ovens will work. See
‘
The Clock
’ section for instructions on setting the time of day.
Hotplate Check
Check each burner in turn. There is a Flame Supervision
Device (FSD) that stops the flow of gas to the burner if the
flame goes out. For each burner, turn the control knob to the
solid flame symbol. Press in the control knob. This lets gas
through to the burner. Keep holding the knob pressed in and
press the igniter button or light with a match. Keep holding
the control knob pressed in for about 10 seconds.
If, when you let go of the control knob the burner goes out,
the safety device has not held in. Wait one minute then try
again this time holding the control pressed in for slightly
longer.
Grill Check
Open the grill compartment door. Turn on the grill control
and check that the grill heats up.
Oven Check
Turn on the oven and check that it starts to heat up. Check
that the oven lights are working.
Note:
The oven light bulb is not included in the guarantee.
Turn off the oven.
Final Fitting
Fitting the Plinth
Remove the 4 screws for the plinth mounts along the front
bottom edge of the cooker
(Fig.7-15)
. Fasten the plinth using
these screws (alternative colour screws can be found in the
loose parts pack).
Fitting the Splashback
Position the splashback on the rear of the hotplate and secure
with the screws supplied.
Customer Care
Installer:
Please complete your details in this guide, inform
the user how to operate the cooker and hand over the
instructions.
Thank you.
ArtNo.281-0026 - Front plinth
Fig.7-15
Содержание Elan 110 Dual Fuel
Страница 1: ...Elan 110 Dual Fuel Australia USER GUIDE INSTALLATION INSTRUCTIONS ...
Страница 2: ......
Страница 4: ...ii ...