16/11/2012
32
ADVANCE STACKING ASSEMBLY MANUAL
ADVANCE STACKING ASSEMBLY MANUAL
ADVANCE STACKING ASSEMBLY MANUAL
ADVANCE STACKING ASSEMBLY MANUAL
1. Assemble the base structure.
2. Place the structure over the oven.
3. Drill and rivet the structure to the lower oven.
REF SAP Description Quantity
12046240 Advance Stacking Horizontal Support 2
12046237 Advance Stacking Vertical Support 2
12008460 SPRING LOCK FREI.700 12
12010065 RIVET AVINOX Ø3.2x6 mm 24
Centrally align the structure over the sides of
the upper panel (19 mm on each side)
Align the structure at the rear of the upper
panel
Содержание ADVANCE CONCEPT
Страница 16: ...16 11 2012 16 ACG 101 AG 101 APG 101 A Soft water intake C Mains supply D Drainage E Gas inlet F Air inlet...
Страница 17: ...16 11 2012 17 ACG 201 AG 201 APG 201 A Soft water intake C Mains supply D Drainage E Gas inlet F Air inlet...
Страница 18: ...16 11 2012 18 ACG 102 AG 102 APG 102 A Soft water intake C Mains supply D Drainage E Gas inlet F Air inlet...
Страница 19: ...16 11 2012 19 ACG 202 AG 202 APG 202 A Soft water intake C Mains supply D Drainage E Gas inlet F Air inlet...
Страница 20: ...16 11 2012 20 ACE 061 AE 061 APE 061 A Soft water intake C Mains supply D Drainage...
Страница 21: ...16 11 2012 21 ACE 101 AE 101 APE 101 A Soft water intake C Mains supply D Drainage...
Страница 22: ...16 11 2012 22 ACE 201 AE 201 APE 201 A Soft water intake C Mains supply D Drainage...
Страница 23: ...16 11 2012 23 ACE 102 AE 102 APE 102 A Soft water intake C Mains supply D Drainage...
Страница 24: ...16 11 2012 24 ACE 202 AE 202 APE 202 A Soft water intake C Mains supply D Drainage...
Страница 86: ...99 16 11 2012 86...
Страница 92: ...99 16 11 2012 92...
Страница 93: ...99 16 11 2012 93...
Страница 94: ...99 16 11 2012 94...
Страница 95: ...99 16 11 2012 95...
Страница 98: ...99 16 11 2012 98 NOTES NOTES NOTES NOTES...