99
16/11/2012
43
CHAMBER CARD CONTROL
CHAMBER CARD CONTROL
CHAMBER CARD CONTROL
CHAMBER CARD CONTROL ---- 12046659 (
12046659 (
12046659 (
12046659 (all models
all models
all models
all models))))
⇒
⇒
⇒
⇒
Power supply 12–0-12 V. +/- 15% VAC, 50/60 Hz
⇒
⇒
⇒
⇒
2 BMF ports
For recording software versions andlog extraction and HACCP values
For communication with other card.
⇒
⇒
⇒
⇒
1 RS485 port for communication with frequency variator
⇒
⇒
⇒
⇒
1 NTC for measuring electronic plate temperature
⇒
⇒
⇒
⇒
1 0-10 V analogue output for frequency variator speed setting
⇒
⇒
⇒
⇒
10 outputs with 220 V/240 V 50/60 Hz/1ª relay
2 outputs for chamber heating
•
CC1
•
CC2
2 outputs for frequency variator that control chamber turbine
•
Left/Right
•
Run/Stop
2 outputs for solenoid valves
•
Condensation (VCN)
•
Humidifier (VHM)
1 switched output for fluepipe (Ms/Mb) motor 30 W.
⇒
⇒
⇒
⇒
1 main supply relay output (RG).
⇒
⇒
⇒
⇒
1 fan output (VE)
⇒
⇒
⇒
⇒
1 chamber lighting output (LZ)
⇒
⇒
⇒
⇒
10 signal inputs
8 temperature thermocouple inputs (K-type)
•
Camera probe (TC)
•
Steam outlet probe (TV)
•
Steam generator probe (TG)
•
Core probe 5 points (TN1, TN2, TN3, TN4, TN5)
1 contact input (open or closed with interlocking) for door (IP)
1 analogue input (0 – 10 V) to read frequency of frequency variator (A.E.)
Содержание ADVANCE CONCEPT
Страница 16: ...16 11 2012 16 ACG 101 AG 101 APG 101 A Soft water intake C Mains supply D Drainage E Gas inlet F Air inlet...
Страница 17: ...16 11 2012 17 ACG 201 AG 201 APG 201 A Soft water intake C Mains supply D Drainage E Gas inlet F Air inlet...
Страница 18: ...16 11 2012 18 ACG 102 AG 102 APG 102 A Soft water intake C Mains supply D Drainage E Gas inlet F Air inlet...
Страница 19: ...16 11 2012 19 ACG 202 AG 202 APG 202 A Soft water intake C Mains supply D Drainage E Gas inlet F Air inlet...
Страница 20: ...16 11 2012 20 ACE 061 AE 061 APE 061 A Soft water intake C Mains supply D Drainage...
Страница 21: ...16 11 2012 21 ACE 101 AE 101 APE 101 A Soft water intake C Mains supply D Drainage...
Страница 22: ...16 11 2012 22 ACE 201 AE 201 APE 201 A Soft water intake C Mains supply D Drainage...
Страница 23: ...16 11 2012 23 ACE 102 AE 102 APE 102 A Soft water intake C Mains supply D Drainage...
Страница 24: ...16 11 2012 24 ACE 202 AE 202 APE 202 A Soft water intake C Mains supply D Drainage...
Страница 86: ...99 16 11 2012 86...
Страница 92: ...99 16 11 2012 92...
Страница 93: ...99 16 11 2012 93...
Страница 94: ...99 16 11 2012 94...
Страница 95: ...99 16 11 2012 95...
Страница 98: ...99 16 11 2012 98 NOTES NOTES NOTES NOTES...