English
English
Delivery of the coffee
Remove the filter holder
(10
), empty out any coffee grouts and fill it up
with 1 or 2 servings of ground coffee, depending on the filter holder
used.
Press the ground coffee in filter down uniformly, using the grinder/doser
presser.
Remove any residues of ground coffee from the filter rim.
Fit and tighten the filter holder (
10
) on the coffee dispenser unit, positioning
the cup (or cups) under the nozzle (or nozzles) of the filter holder (
10
).
Press the coffee dispensing push button (
16, 17, 19, 20
) for the required
serving; the machine will stop automatically.
Press the push button (
21
) for continuous dispensing.
Dispensing, whether for dosed servings or in the continuous dispensing
mode, can be interrupted at any time by pressing the STOP push button
(
18
).
10
16
17 20
18
19
21
Daily Switch-On
Before using the machine make sure that:
the main electricity supply ON/OFF switch is ON;
the water supply and water softener taps are open .
!
Turn the main switch (
1
) to position 1.
The boiler is filled until the set level is reached.
Turn the main ON/OFF switch (
1
) to position 2.
Heating
now begins.
At the end of the day, turn the machine OFF by turning the main ON/OFF switch (
1
) to position 0.
" Dont switch on the gas installation when the
boiler is under pressure ".
Before using the machine check that:
- the main electricity supply ON/OFF switch is ON;
- the main water supply tap is open .
- the gas supply tap is open.
Turn the main switch ON/OFF (
1
) to position 1.
The machine completes the operations described under
Daily Switch-
On
.
Press and turn the gas tap knob (
4
) counter-clockwise and repeatedly
press the piezoelectric switch-on push-button (
3
) until the burner under
the boiler lights up.
Check through the observation window that the burner is lit and, after a
few seconds, release the knob (
4
).
Heating
now begins.
!
At the end of the day, switch off the machine by turning the ON/OFF switch (
1
) to the "0" position and close the gas tap (
4
) by turning it to the
"0" position.
Gas installation switch-on (for "G" machines only)
3
4
Heating phase
During heating, if one of the coffee dispensing push buttons
(
16
,
17
,
19
,
20
,
21
) is pressed, the machine dispenses a coffee at the
temperature reached at the time.
Heating is completed when the boiler gauge indicator (
14
) remains
stable in the green area.
The machine is now ready to dispense coffee, steam and hot water.
To make sure that the dispenser unit and the filter holder
(10
) are at
similar temperatures, press the coffee dispensing push button (
21
) and
let the machine dispense coffee for a few seconds. Then press the
STOP push button (
18
) to stop dispensing.
Содержание DUE/A
Страница 3: ...DUE A 15 1 4 10 7 10 6 7 9 2 8 13 6 2 14 5 3 12 11 22 18 21 20 17 19 16...
Страница 28: ...Schema elettrico Wiring diagram Schema electrique Elektrischer Schaltplan Esquema electrico Esquema el ctrico...
Страница 30: ...Circuito idraulico Hydraulic circuit Circuit hydraulique Hydraulikplan Circuito hidraulico Circuito hidr ulico...