32. Locate the factory trac bar and upper hardware and the
lower factory trac bar bolt and nut tab. Position the trac
bar into the new mount on the axle and attach with the
factory bolt and nut tab. Then attach the trac bar to the
factory upper mount with the factory hardware. Torque the
factory hardware & 9/16” hardware to **184 ft. lbs.
SEE FIGURES 58-59.
33. Torque the pivot bolts in all the front link arms to**85 ft.
lbs.
31. Install front tires and wheels. Torque lug nuts to wheel
manufacturer’s specifications. Turn wheels left to right to
check for proper clearance of brake lines, ABS lines, and
fenders.
FIGURE 56
FIGURE 57
FIGURE 58
FIGURE 59
MAKE SURE THE 1/2” BOLT IS MOUNTED WITH THE
HEAD OF THE BOLT OUTWARD TOWARDS THE TIRE
FACTORY TRAC BAR BOLT AND HARDWARE
16 of 31