background image

 

Please note 

The  service technician must show the user how to control the  boiler and  enter the date  when the boiler 

was  put into service into the Warranty Certificate. 

7.2

 

F

ILLING UP DRAINING THE  HEATING  SYSTEM

 

The  system can olny been  filled up or topped up with water which meets the parameters specified by EN 

standarts.The  water    must  be    clear,colourless,free  of  suspended  particles,oil  and  chemicall  corrosive 
substances,and  must  not be acidid.First of all,the  heating  system  must be thoroughly flushed and all dirt  washed 
out. 

Please note 

Water  in  system  must  not  be  reduced  or  put  out  unless  the  boilers  is  in    service  or  under  freezing 

danger.Against  freezing liquid can be  added in to system water at the  rate of %15. 

Please note 

The  failure to meet  this requirement may  lead  to the  heat exchanger getting cloggedup,  and  the  cast 

iron block may crack as a result.During the  heating season,aconstant volume of  water must be maintained inside 
the  heating  system.When topping up water,care must  be taken that no air is  sucked into the system.Water must 
never be  let out of  the boiler or the  heating system,unless i tis  absolutely esential,sucha as before  repairs,etc. 
Draining  water  and  refilling  the  system  with  new  water  increases  the  risk  of    corrosion  and    formation  of  
incrustation. 

Please note  

Filling  or  topping  up  water  to    the    heating  system  must    always  be  done  with  the    boiler  cold or  cooled 

down, otherwise the  segments may crack! 

8

 

OPERATION AND  CONTROLS 

8.1

 

S

TARTING A

 

FIRE

 

Check on the  thermo-manometer whether there is  enough water in  the  heating system.Open the  shutting  

valve between the  boiler and  the  heating system.Spread   paper on the top of the  clean stoker and  then  enough 
finely  chopped  wood.Open  the    fuel  flap  in    the  chimney  adapter  and    shut  the    stoking  door.Light  the  paper  
through the  ashtray door  and  fully open the regulating flap in the  ashtray door.The  fire has  caught up  enough, 
stoke a layer of  mainfuel on  top  of the  burning firewood.When the  fire is powerfull enough,stoke  more fuel 
right up  to  the  bottom edge of  the  stoking door  and  level it into.Provide an even layer throuhout the  entire 
boiler depth.If the  fuel suddenly turns into dark red blaze,open partially  the  secondary  air supply rosette in the  
stokin  door.When  the    flame  turns  yellow,shut  the    secondary  air    suppply  rosette  again.When  the  boiler  has 
reached  the required output,it is suitable to  partially shut  the fuel thrust flap to prevent heat  form  unnecessarily 
escaping into the   chimney. 

-Do not  start  the boiler without connecting the boiler to the chimney. 

-Control chimney connection before  starting  the boiler. 

-Adjust  the  chimney  blows as  requested level.If  chimney blows  is under  mentioned levels    try not to 

 

user the  boiler. 

8.2

 

S

ETTING THE  OUTLET WATER TEMPERATURE

 

When  the  required outlet water  temperature is say 60 C ,heat up the boiler to a temperature for instance  5 

C higher than  the  required temperature of 60 C (measured on the  thermometer on the  boiler outlet  pipe).Then 
turn  the control knob to 65 C and   check  whether the  chain is  stretched and  the   control knob.Then  let  the  
process  work.When  the  water  temperature  suddenly rises,the  regulating hatch  will start opening.And the  hot  
water temperature on the  boiler outlet is  controlled. 

8.3

 

S

TOKING

 

First  shut    the    regulating  hatch,this    will  shut  supply  of  combustion  air    into  the    boiler.Then    open    the  

chimney flap completly.Partially open  the  stoking door and   wait until  all combustion gases have  been  sucked 
from    the    combustion  chamber  into  the    chimney.Only    then    open  the    stoking  door    compleletly  and    start  
stoking the  boiler.After shutting the  stoking door ,set the  chimney  flap  again and  restore the  functioning of  
the  regulating hatch. 

-Boiler doors must not be  held open as the  boiler is  continously working. 

Содержание STR PLUS 25

Страница 1: ...STR SERIES WOOD AND COAL BOILER INSTALLATION AND MAINTENANCE MANUAL FABRIKA SK S R O PAVLA MUDROŇA 5 01001 ŽILINA SLOVAKIA Tel 421908 599 938 e mail world fabrikask sk ...

Страница 2: ... boiler Keep the original packing until the boiler has been put into service in case the to be transported again 11 When making any repairs olny original parts must always be used It is forbidden make any changes to the boiler s internal installaton orto interfere with it any way 12 At the end of its life cyyle the boiler its package and its parts must be disposed of in a way avoiding harm ti the ...

Страница 3: ...TR PLUS 25 STR PLUS 35 STR PLUS 45 Width of the boiler W 555 555 555 Boiler depth L 700 800 900 L1 500 600 700 Water connection Water outlet VK 2 2 2 Return water RK 2 2 2 Eductive valve Chimney diameter mm 150 150 180 D 147 147 174 D1 122 122 134 D2 277 277 277 ...

Страница 4: ...Packaging Width W 640 640 640 Packaging Depth L 710 790 890 Packaging Height H 1220 1220 1220 3 BOILER COMBUSTION SYSTEM STR PLUS Series boilers are designed so that the exhaust warmth air gave a heat to the three contact surfaces and large combustion chamber provides increased user comfort ...

Страница 5: ... 270 Boiler Net Weight kg 205 226 247 5 OPERATING INSTRUCTIONS 5 1 STR SERIES GENERAL FEATURES STR series soild fuel fired boiler is designed for heating both residental and industrial buildings Beside Professional installation preconditiion for correct functionning of the boiler is required chimney thrust and correct operration STR series boiler soild fuel fired boiler is designed for heating sys...

Страница 6: ...ermeath the boiler stoker by opening or shutting a flap situated in the ashtray door When fitting the safety and the control elements remember to meet the principles of work safety If replacing of safety device and of thermo mechanical output regulator is necessary please use recommended devices in case of using any other type of the device negotiate with distributor Functionality of thermo mechan...

Страница 7: ...e Intel outlet connections of the boiler Please note It is not permissible to reverse the flows the indications for inlet and drain shown on the valve must be followed Maximum temperature of the input water for temperature safety valve is 15 C and minimum water pressure is 2 bar Functionality of safety device DBV1 must be checked or inspected by authorized person oncee in a year Safety valve Fig 0...

Страница 8: ... water volume resulting frok heating and cooling The expansion tanks and their connecting pipes must be protected against to freezing Diameter of drainage pipe must be selected properly against to overflow into tank 7 PUTTING THE BOILLER INTO SERVICE 7 1 1 Checking the boiler before turning it on Before putting the boiler into operation the service technician must check Whether the installation co...

Страница 9: ...ht the paper through the ashtray door and fully open the regulating flap in the ashtray door The fire has caught up enough stoke a layer of mainfuel on top of the burning firewood When the fire is powerfull enough stoke more fuel right up to the bottom edge of the stoking door and level it into Provide an even layer throuhout the entire boiler depth If the fuel suddenly turns into dark red blaze o...

Страница 10: ...g system output An oversized boilers suffers unnecessarily because it has to be run at low temperatures 8 7 BOILER SHUTDOWN We do not recommend that you try to speed up the boiler combustion process The fuel must burn completly on its own on the stoker 8 7 1 Short term shut down After shutting the boiler down clean it remove all combustion residuals empty the ashtray clean the stoking door contact...

Страница 11: ...n circulate all the throught at least some of the radiators Antifreeze fluids because of their unsuitable properties we do not recommend to them They have a reduced ability to transfer heat have large volumetric expansion age and damage rubber componentss If under concrete circumstances is no other option how reliable prevent Before finalinstalation the heating system distribution piping must be f...

Страница 12: ...high positioning the boiler in the middle To comply with standarts at least 600 mm manipilation space must be left in front of the boiler Minimum distance between the back of the boiler and the wall must be also 600 mm and a free space of at least 600 mm must be left between one side of the boiler and the wall toallow acees to the rear of the boilerr Fuel must not be stacked directly behind on nex...

Страница 13: ... system and push fitted onto the boiler flue socket it should be fitted very carefully so that it does not come loose Only use parts of non flamable materials for the flue gas system 13 CHIMENYS AND CHIMNEY CONNECTION WARNINGS A sufficient flue draft of the flue gas system is the basic requirements for the correct functioning of the boiler It fundamentally affects its performance and effciency The...

Страница 14: ...tes for the purpose of recovery of insurance claims for damaged goods For confirmation of receipt deliverable is usually considered the signature of the purchaser on the accompanying documentation which is usually a delivery note invoice acceptance protocol 2 The manufacturer warrants the product 24 months from date of sale to the final consumer not more than 36 months from the date of manufacture...

Страница 15: ...mation report about the emerged failure sent by other means than by post has to be confirmed by a letter sent within three days at most Authorized person is obliged to prove to the supplier the occurrence of damage caused by the failure of the product without postponement three workdays since the request from the side of the supplier at latest Producer is obliged to take stand in written form with...

Страница 16: ...16 RECORD OF PERFORMED GUARANTEE REPAIRS Record of performed repairs within guarantee period and after Date of the record Performed activity Organization signature stamp Signature of the customer ...

Страница 17: ... Production date Stamp and signature of the distributor Date of sale Stamp and signature of the seller Date of putting into operation Stamp and signature Letter of guarantee is not valid unless properly filled in and confirmed by the seller or when rewritten in this case guarantee expires Customer is obliged to control all the documents By buying the product customer fully agrees with all conditio...

Страница 18: ...sure the conformity of the following products with the technical documentation and the requirements of relevant government regulations Product STR series wood and coal boiler Type STR PLUS 25 STR PLUS 35 STR PLUS 45 Additional information The certificate report on initial tests Certificate Z IS TGK IST 11 12 1210001399 01 11 B 00730 from 20th DECEMBER 2011 Report P IS TGK IST 11 12 12100013990111 ...

Страница 19: ...stomer s signature declares that the product is taken over without defects damage fully functional and was acquainted with the operation and use of the product Its a customer responsibility in taking the product product unpack and inspect A Letter of customer has to be sent to address of Company within 7 days from starting in operation of the product Company seller Customer ...

Отзывы: