background image

 

 

5.2

 

R

ECOMMENDED FUEL 

 

-Recommended fuels  for STR boilers are coal, coke  and  firewood. 

-Optimal coal  and  coke  granularity is  24-60 mm. 

-Optimal  firewood  size  is logs of  diameter 40-100 mm. Their lengh will depnded on  how  many  kW 

 

Size. 

-Fuel  must  be   stored   in a dry  place. To reach  the   boiler  nominal output,water   content in   firewood  

 

must  not  exceed 20% 

-

 When fitting the safety and the control elements remember to meet the principles of work safety. 

-If replacing of safety deviced and of thermo mechanical regulator is necessary,please use recommented 

 

devices in case of using any other type of the  device negotiate with satrom. 

-  Functionality  of  thermo-mechanical  output  regulator  must  be  checked  or  inspected  by  authorized 

 

person once in a year. 

Please note 

The boiler is not  intended for burning any  type  of  waste. 

6

 

CONTROL AND SAFETY  DEVICES 

6.1

 

T

HERMO 

 MECHANICAL REGULATOR

 

It is  situated on  the  outlet from  the   boiler cast  iron body.It detect temperature of  the   hot  water  and  

regulates the  supply  of primary  combustion air  to  undermeath the  boiler  stoker,by  opening  or  shutting a flap 
situated in the  ashtray door. When fitting  the  safety  and  the control  elements remember to  meet  the  principles 
of work safety.If  replacing  of safety  device and  of thermo-mechanical output  regulator  is necessary, please use 
recommended devices in  case  of  using  any  other  type  of  the   device negotiate with  distributor. Functionality 
of  thermo-mechanical    output  regulator(satrom)  must  be  checked  or    inspected  by  authorized    person    once    in  
a year.   

 

thermo-mechanical output regulator (Fig.01) 

6.2

 

R

EGULATING HATCH

 

Changing  the  hatch  position  control  the  combusting  intensity  and  thus  the  boiler  output.The    thermo 

mechanical  regulator  is  connected  with  the    regulating  hatch  by  chain.  The  chain  is  connected  to  the  hatch  in 
such a way  that its tension can be set. 

Keep  object´s away from  regulation hatch´s (Fig.02), front  and  channels 

for  allowing primary  air  transfer.

 

6.3

 

A

IR ROSETTE

 

Supply of secondary combustion air is controlled by an air rosette (Fig.03) situated in the boiler´s stoking 

door,which has a direct effect on the level of emission.  

6.4

 

T

HERMOMETER

 

Hot  water  temperature  can  be  checked  on  a thermometer  (Fig.  04),  which  is  situated  in  the  upper            

up with side boiler cover.                                                                                   

Содержание STR PLUS 25

Страница 1: ...STR SERIES WOOD AND COAL BOILER INSTALLATION AND MAINTENANCE MANUAL FABRIKA SK S R O PAVLA MUDROŇA 5 01001 ŽILINA SLOVAKIA Tel 421908 599 938 e mail world fabrikask sk ...

Страница 2: ... boiler Keep the original packing until the boiler has been put into service in case the to be transported again 11 When making any repairs olny original parts must always be used It is forbidden make any changes to the boiler s internal installaton orto interfere with it any way 12 At the end of its life cyyle the boiler its package and its parts must be disposed of in a way avoiding harm ti the ...

Страница 3: ...TR PLUS 25 STR PLUS 35 STR PLUS 45 Width of the boiler W 555 555 555 Boiler depth L 700 800 900 L1 500 600 700 Water connection Water outlet VK 2 2 2 Return water RK 2 2 2 Eductive valve Chimney diameter mm 150 150 180 D 147 147 174 D1 122 122 134 D2 277 277 277 ...

Страница 4: ...Packaging Width W 640 640 640 Packaging Depth L 710 790 890 Packaging Height H 1220 1220 1220 3 BOILER COMBUSTION SYSTEM STR PLUS Series boilers are designed so that the exhaust warmth air gave a heat to the three contact surfaces and large combustion chamber provides increased user comfort ...

Страница 5: ... 270 Boiler Net Weight kg 205 226 247 5 OPERATING INSTRUCTIONS 5 1 STR SERIES GENERAL FEATURES STR series soild fuel fired boiler is designed for heating both residental and industrial buildings Beside Professional installation preconditiion for correct functionning of the boiler is required chimney thrust and correct operration STR series boiler soild fuel fired boiler is designed for heating sys...

Страница 6: ...ermeath the boiler stoker by opening or shutting a flap situated in the ashtray door When fitting the safety and the control elements remember to meet the principles of work safety If replacing of safety device and of thermo mechanical output regulator is necessary please use recommended devices in case of using any other type of the device negotiate with distributor Functionality of thermo mechan...

Страница 7: ...e Intel outlet connections of the boiler Please note It is not permissible to reverse the flows the indications for inlet and drain shown on the valve must be followed Maximum temperature of the input water for temperature safety valve is 15 C and minimum water pressure is 2 bar Functionality of safety device DBV1 must be checked or inspected by authorized person oncee in a year Safety valve Fig 0...

Страница 8: ... water volume resulting frok heating and cooling The expansion tanks and their connecting pipes must be protected against to freezing Diameter of drainage pipe must be selected properly against to overflow into tank 7 PUTTING THE BOILLER INTO SERVICE 7 1 1 Checking the boiler before turning it on Before putting the boiler into operation the service technician must check Whether the installation co...

Страница 9: ...ht the paper through the ashtray door and fully open the regulating flap in the ashtray door The fire has caught up enough stoke a layer of mainfuel on top of the burning firewood When the fire is powerfull enough stoke more fuel right up to the bottom edge of the stoking door and level it into Provide an even layer throuhout the entire boiler depth If the fuel suddenly turns into dark red blaze o...

Страница 10: ...g system output An oversized boilers suffers unnecessarily because it has to be run at low temperatures 8 7 BOILER SHUTDOWN We do not recommend that you try to speed up the boiler combustion process The fuel must burn completly on its own on the stoker 8 7 1 Short term shut down After shutting the boiler down clean it remove all combustion residuals empty the ashtray clean the stoking door contact...

Страница 11: ...n circulate all the throught at least some of the radiators Antifreeze fluids because of their unsuitable properties we do not recommend to them They have a reduced ability to transfer heat have large volumetric expansion age and damage rubber componentss If under concrete circumstances is no other option how reliable prevent Before finalinstalation the heating system distribution piping must be f...

Страница 12: ...high positioning the boiler in the middle To comply with standarts at least 600 mm manipilation space must be left in front of the boiler Minimum distance between the back of the boiler and the wall must be also 600 mm and a free space of at least 600 mm must be left between one side of the boiler and the wall toallow acees to the rear of the boilerr Fuel must not be stacked directly behind on nex...

Страница 13: ... system and push fitted onto the boiler flue socket it should be fitted very carefully so that it does not come loose Only use parts of non flamable materials for the flue gas system 13 CHIMENYS AND CHIMNEY CONNECTION WARNINGS A sufficient flue draft of the flue gas system is the basic requirements for the correct functioning of the boiler It fundamentally affects its performance and effciency The...

Страница 14: ...tes for the purpose of recovery of insurance claims for damaged goods For confirmation of receipt deliverable is usually considered the signature of the purchaser on the accompanying documentation which is usually a delivery note invoice acceptance protocol 2 The manufacturer warrants the product 24 months from date of sale to the final consumer not more than 36 months from the date of manufacture...

Страница 15: ...mation report about the emerged failure sent by other means than by post has to be confirmed by a letter sent within three days at most Authorized person is obliged to prove to the supplier the occurrence of damage caused by the failure of the product without postponement three workdays since the request from the side of the supplier at latest Producer is obliged to take stand in written form with...

Страница 16: ...16 RECORD OF PERFORMED GUARANTEE REPAIRS Record of performed repairs within guarantee period and after Date of the record Performed activity Organization signature stamp Signature of the customer ...

Страница 17: ... Production date Stamp and signature of the distributor Date of sale Stamp and signature of the seller Date of putting into operation Stamp and signature Letter of guarantee is not valid unless properly filled in and confirmed by the seller or when rewritten in this case guarantee expires Customer is obliged to control all the documents By buying the product customer fully agrees with all conditio...

Страница 18: ...sure the conformity of the following products with the technical documentation and the requirements of relevant government regulations Product STR series wood and coal boiler Type STR PLUS 25 STR PLUS 35 STR PLUS 45 Additional information The certificate report on initial tests Certificate Z IS TGK IST 11 12 1210001399 01 11 B 00730 from 20th DECEMBER 2011 Report P IS TGK IST 11 12 12100013990111 ...

Страница 19: ...stomer s signature declares that the product is taken over without defects damage fully functional and was acquainted with the operation and use of the product Its a customer responsibility in taking the product product unpack and inspect A Letter of customer has to be sent to address of Company within 7 days from starting in operation of the product Company seller Customer ...

Отзывы: