FABRIKA SK STR PLUS 25 Скачать руководство пользователя страница 15

 

4)  

In  case  of  failure  of  a  component,  this  component  will  be  repaired  or  changed  within  a  guarantee  period 
after the damaged component has been delivered with covered cost for the transport by customer.

  

5)  Guarantee is valid if the product is being used as described and determined in the letter of guarantee. In case the 

relevant  instructions  are  not  fulfilled,  guarantee  will  fail.  This  is  valid  also  for  damages  caused  during  transport 
that has not been provided by our company´s means by our own vehicle and our drivers. Therefore it is necessary 
to  control  the  product  and  check  possible  imperfections  when  receiving  the  product  or  report  the  failures  to  the 
seller when receiving the product.  

6)  Guarantee  expires  in  case  of  failures  caused  by  unprofessional  plugging  (by  not  keeping  to  the  connection 

mentioned in the manual), in case of overloading as a result of high voltage or voltage change or when using fuel 
other than prescribed for this type of product.  

 

Guarantee does not include any materials that are subject to common wear and tear: sealing and packing rope, fire 
concrete block and filling and sibral filling.   

 

Guarantee will not be granted and accepted in case the customer does not fulfill agreed account terms in due date 
to the seller. Minor variations in colour, enamel or dimension do not represent a reason for complaint.  

Transport 

of  a  service  technician  does  not  fall  within  quarantee  repairs  and  the  customer  endows  the  cost  to  full 
extent. 

   

7)  Possible complaints of any sort must be sent by the end customer 

in written form

 within three workdays since the 

day  of  discovery  of  failure  by  post,  fax  or  the  electronic  post  and  the  supplier  must  be  given  all  relevant 
information; report about the emerged failure sent by other means than by post has to be confirmed by a letter sent 
within three days at most. Authorized person is obliged to prove to the supplier the occurrence of damage caused 
by the failure of the product without postponement - three workdays since the request from the side of the supplier 
at latest. Producer is obliged to take stand in written form within 30 days from the announcement of the complaint 
and in case of accepting the complaint remove the failure. 

 

Costs  for  ungrounded  complaints,  damages  caused  by  the  user  by  not  abiding  by  the  manual,  unprofessionally 
performed assemblage, that may result in wrong operation of the product or reduced performance are covered by 
the user of the product to full extent. 

 

Rights  of  the  responsibility  for  the  failures  of  the  product  that  fall  under  the  guarantee  period  lapse  when  not 
enforced during the guarantee period.  

Customer has been acquainted with the operation of the boiler by purchase of the product.  

 

Producing  company  rejects  any  responsibility  for  material  or  property  damage  either  direct  or  indirect  including 
consequent  damages.  Claims  from  damages  of  the  product  do  not  affect  claims  for  damages  caused  by  casual 
relationship with the damage of the product.    

 

Producer  reserves  the  right  of  change  in  innovation  of  the  product  that  may  not  be  included  in  this 
instruction. 

 

In case of intervention into  the wiring of the boiler by  person other than authorized service technician or 
other professionally trained worker the guarantee expires. 

 

 

The  letter  of  customer  must  be  duly  filled  in  and  sent  to  the  producer  or  otherwise  customer  loses  claim  on  the 
repair  under  guarantee.  All  Products  of  Factory  Fabrika  SK  Ltd.  are  certified  to  applicable  standards  and 
regulations.  Technical  and  design  modifications  reserved.  A  company  Fabrika  SK  Ltd.  is  not  responsible  for 
typographical errors. 

 

 

 

 

 

 

 

 

Содержание STR PLUS 25

Страница 1: ...STR SERIES WOOD AND COAL BOILER INSTALLATION AND MAINTENANCE MANUAL FABRIKA SK S R O PAVLA MUDROŇA 5 01001 ŽILINA SLOVAKIA Tel 421908 599 938 e mail world fabrikask sk ...

Страница 2: ... boiler Keep the original packing until the boiler has been put into service in case the to be transported again 11 When making any repairs olny original parts must always be used It is forbidden make any changes to the boiler s internal installaton orto interfere with it any way 12 At the end of its life cyyle the boiler its package and its parts must be disposed of in a way avoiding harm ti the ...

Страница 3: ...TR PLUS 25 STR PLUS 35 STR PLUS 45 Width of the boiler W 555 555 555 Boiler depth L 700 800 900 L1 500 600 700 Water connection Water outlet VK 2 2 2 Return water RK 2 2 2 Eductive valve Chimney diameter mm 150 150 180 D 147 147 174 D1 122 122 134 D2 277 277 277 ...

Страница 4: ...Packaging Width W 640 640 640 Packaging Depth L 710 790 890 Packaging Height H 1220 1220 1220 3 BOILER COMBUSTION SYSTEM STR PLUS Series boilers are designed so that the exhaust warmth air gave a heat to the three contact surfaces and large combustion chamber provides increased user comfort ...

Страница 5: ... 270 Boiler Net Weight kg 205 226 247 5 OPERATING INSTRUCTIONS 5 1 STR SERIES GENERAL FEATURES STR series soild fuel fired boiler is designed for heating both residental and industrial buildings Beside Professional installation preconditiion for correct functionning of the boiler is required chimney thrust and correct operration STR series boiler soild fuel fired boiler is designed for heating sys...

Страница 6: ...ermeath the boiler stoker by opening or shutting a flap situated in the ashtray door When fitting the safety and the control elements remember to meet the principles of work safety If replacing of safety device and of thermo mechanical output regulator is necessary please use recommended devices in case of using any other type of the device negotiate with distributor Functionality of thermo mechan...

Страница 7: ...e Intel outlet connections of the boiler Please note It is not permissible to reverse the flows the indications for inlet and drain shown on the valve must be followed Maximum temperature of the input water for temperature safety valve is 15 C and minimum water pressure is 2 bar Functionality of safety device DBV1 must be checked or inspected by authorized person oncee in a year Safety valve Fig 0...

Страница 8: ... water volume resulting frok heating and cooling The expansion tanks and their connecting pipes must be protected against to freezing Diameter of drainage pipe must be selected properly against to overflow into tank 7 PUTTING THE BOILLER INTO SERVICE 7 1 1 Checking the boiler before turning it on Before putting the boiler into operation the service technician must check Whether the installation co...

Страница 9: ...ht the paper through the ashtray door and fully open the regulating flap in the ashtray door The fire has caught up enough stoke a layer of mainfuel on top of the burning firewood When the fire is powerfull enough stoke more fuel right up to the bottom edge of the stoking door and level it into Provide an even layer throuhout the entire boiler depth If the fuel suddenly turns into dark red blaze o...

Страница 10: ...g system output An oversized boilers suffers unnecessarily because it has to be run at low temperatures 8 7 BOILER SHUTDOWN We do not recommend that you try to speed up the boiler combustion process The fuel must burn completly on its own on the stoker 8 7 1 Short term shut down After shutting the boiler down clean it remove all combustion residuals empty the ashtray clean the stoking door contact...

Страница 11: ...n circulate all the throught at least some of the radiators Antifreeze fluids because of their unsuitable properties we do not recommend to them They have a reduced ability to transfer heat have large volumetric expansion age and damage rubber componentss If under concrete circumstances is no other option how reliable prevent Before finalinstalation the heating system distribution piping must be f...

Страница 12: ...high positioning the boiler in the middle To comply with standarts at least 600 mm manipilation space must be left in front of the boiler Minimum distance between the back of the boiler and the wall must be also 600 mm and a free space of at least 600 mm must be left between one side of the boiler and the wall toallow acees to the rear of the boilerr Fuel must not be stacked directly behind on nex...

Страница 13: ... system and push fitted onto the boiler flue socket it should be fitted very carefully so that it does not come loose Only use parts of non flamable materials for the flue gas system 13 CHIMENYS AND CHIMNEY CONNECTION WARNINGS A sufficient flue draft of the flue gas system is the basic requirements for the correct functioning of the boiler It fundamentally affects its performance and effciency The...

Страница 14: ...tes for the purpose of recovery of insurance claims for damaged goods For confirmation of receipt deliverable is usually considered the signature of the purchaser on the accompanying documentation which is usually a delivery note invoice acceptance protocol 2 The manufacturer warrants the product 24 months from date of sale to the final consumer not more than 36 months from the date of manufacture...

Страница 15: ...mation report about the emerged failure sent by other means than by post has to be confirmed by a letter sent within three days at most Authorized person is obliged to prove to the supplier the occurrence of damage caused by the failure of the product without postponement three workdays since the request from the side of the supplier at latest Producer is obliged to take stand in written form with...

Страница 16: ...16 RECORD OF PERFORMED GUARANTEE REPAIRS Record of performed repairs within guarantee period and after Date of the record Performed activity Organization signature stamp Signature of the customer ...

Страница 17: ... Production date Stamp and signature of the distributor Date of sale Stamp and signature of the seller Date of putting into operation Stamp and signature Letter of guarantee is not valid unless properly filled in and confirmed by the seller or when rewritten in this case guarantee expires Customer is obliged to control all the documents By buying the product customer fully agrees with all conditio...

Страница 18: ...sure the conformity of the following products with the technical documentation and the requirements of relevant government regulations Product STR series wood and coal boiler Type STR PLUS 25 STR PLUS 35 STR PLUS 45 Additional information The certificate report on initial tests Certificate Z IS TGK IST 11 12 1210001399 01 11 B 00730 from 20th DECEMBER 2011 Report P IS TGK IST 11 12 12100013990111 ...

Страница 19: ...stomer s signature declares that the product is taken over without defects damage fully functional and was acquainted with the operation and use of the product Its a customer responsibility in taking the product product unpack and inspect A Letter of customer has to be sent to address of Company within 7 days from starting in operation of the product Company seller Customer ...

Отзывы: