background image

 

THANK YOU FOR BUYING OUR PRODUCT! 

 INTRODUCTION 

1

.

The  boilerand  and  all  associated    equipment  must  be  installed  and  used  in  accordance  with  the  installation 

design,  all  applicable  legal  regulations  and    technical  standards  and  with  manufacturer´s  instructions.The  boiler 
may be used  only for the purpose for which it is intended. 

2.The boiler may be instelled only in an enviroment which i tis designed for.If the boiler is delivered to the client 
by  the  same  person  who  installs  it,  he  must  give  the  user  also  all  accompanying  boiler    documentation(  in 
particular User Guide, Service Book, etc.). Until the  boiler is put into service, the  original packing must be kept 
in case the  boiler has to be transported again. 

3.After installation,the boiler must be put into operation  by a service organisation authorized by the manufacturer. 

4.The    boiler  complies  with    regulations  applicable  in  the    European  Union.When    used  in    the    conditions  of 
countries  outside at EU, any deviations from local regulations must be identified and rectified. 

5.In the  event ofa defect, call an  authorized manufacture´s service  organisation-any unauthorized  interference 
may  damaged  the  boiler ( and  possibly also  associated equipment!). 

6.The servicetechnician putting the boiler into operation for the first time must show the user the  various parts of 
the    boiler    and  how    to  control  the    boiler,  with  the  boiler  safety  elements,their    signals  and  appropriate  user 
reaction to them, with fundamental parts of the  boiler controls.If the boiler is  delivered to the client by  the same 
person who installs it,he must make sure that the original packikg is avaible in case the boiler has to be transported 
again. 

7.Chek the delivery for completeness. 

8.Chek whether the model and type supplied is suitable for the  required use. 

9.Whenever  you  are  not  certain  how  to  control  the  boiler,  study  appropiate  instructions  in  this    Operation  and  
installation Guide carefully and proceed  accordingly. 

10.Never remove or damage any markings and  signs on the boiler.Keep the original  packing  until  the  boiler has 
been  put into service, in case  the  to  be transported again. 

11.When  making any repairs, olny original parts  must  always be  used .It  is  forbidden  make any changes to the  
boiler´s   internal installaton, orto interfere with it any way. 

12.At the end of its life cyyle, the boiler its  package  and  its  parts must be  disposed of  in a way avoiding harm ti 
the enviroment. 

13.The manufactured disclaims any responsibility for damages caused  by the  failure to abide by:  

-The conditions stipulated in this  Operation and  Installation Guide 

-Applicable rerulations and standards 

-Sound installation and  operation procedures 

-Condiotions stated in the  Warranty Certificate and the  Service Book. 

Situations might occur in  practice,  when the following esential precaution must be taken: 

Shut the boiler down every time when there  are any  ( event temporary ) flammable or explosive fumes present  
on  the  premises  from whitch  combustion air  is  supplied the boiler ( e.g. from  paint when  painting, laying and  
spraying  molten  substances, from gas leakage, etc. ): if  it is  necessary to drain water  from the   boiler  or  from  
the    whole    system.,  the  water    must  not  be    dangerously  hot.If  there  is  any  leakege    from    the  boiler´s  heat  
exchanger is  clogged  up   with ice , do  not  attempt  to  start  up  the boilre until  normal operating  conditions  
have  been  restored.    

Ensuring safety of equipment and  people

 

The boiler ( and all acessories ) comlies   with  the  requirements of EN 303-5 its  updates and  all  relevant 

European  standarts.  In  order  to  run    and  operate  the    boiler  in  accordance  with  the  purpose  for    which  it    is  
designed    in  actual    conditions    of  use    (  hereafter    referred  to  only  as    use),  it    is    necesarry  to  abide    also    by  
additional   requirements the most  essential ones of  which (i.e. those which must  not be  omitted) are  found in  
the   related regulatory  documents.In  addition to  the  above mentioned documents,  it  is  necessary when using  
the boiler to  proceed  in  accordance  with this. Operation  and  Installation  guide and the  accompanying boiler 
manufacturer´s  documementation. Any interference by children,  person under the  influence of  narcotic drugs, 
certified person,etc,when using  the boiler,  must be  prevented. 

Содержание STR PLUS 25

Страница 1: ...STR SERIES WOOD AND COAL BOILER INSTALLATION AND MAINTENANCE MANUAL FABRIKA SK S R O PAVLA MUDROŇA 5 01001 ŽILINA SLOVAKIA Tel 421908 599 938 e mail world fabrikask sk ...

Страница 2: ... boiler Keep the original packing until the boiler has been put into service in case the to be transported again 11 When making any repairs olny original parts must always be used It is forbidden make any changes to the boiler s internal installaton orto interfere with it any way 12 At the end of its life cyyle the boiler its package and its parts must be disposed of in a way avoiding harm ti the ...

Страница 3: ...TR PLUS 25 STR PLUS 35 STR PLUS 45 Width of the boiler W 555 555 555 Boiler depth L 700 800 900 L1 500 600 700 Water connection Water outlet VK 2 2 2 Return water RK 2 2 2 Eductive valve Chimney diameter mm 150 150 180 D 147 147 174 D1 122 122 134 D2 277 277 277 ...

Страница 4: ...Packaging Width W 640 640 640 Packaging Depth L 710 790 890 Packaging Height H 1220 1220 1220 3 BOILER COMBUSTION SYSTEM STR PLUS Series boilers are designed so that the exhaust warmth air gave a heat to the three contact surfaces and large combustion chamber provides increased user comfort ...

Страница 5: ... 270 Boiler Net Weight kg 205 226 247 5 OPERATING INSTRUCTIONS 5 1 STR SERIES GENERAL FEATURES STR series soild fuel fired boiler is designed for heating both residental and industrial buildings Beside Professional installation preconditiion for correct functionning of the boiler is required chimney thrust and correct operration STR series boiler soild fuel fired boiler is designed for heating sys...

Страница 6: ...ermeath the boiler stoker by opening or shutting a flap situated in the ashtray door When fitting the safety and the control elements remember to meet the principles of work safety If replacing of safety device and of thermo mechanical output regulator is necessary please use recommended devices in case of using any other type of the device negotiate with distributor Functionality of thermo mechan...

Страница 7: ...e Intel outlet connections of the boiler Please note It is not permissible to reverse the flows the indications for inlet and drain shown on the valve must be followed Maximum temperature of the input water for temperature safety valve is 15 C and minimum water pressure is 2 bar Functionality of safety device DBV1 must be checked or inspected by authorized person oncee in a year Safety valve Fig 0...

Страница 8: ... water volume resulting frok heating and cooling The expansion tanks and their connecting pipes must be protected against to freezing Diameter of drainage pipe must be selected properly against to overflow into tank 7 PUTTING THE BOILLER INTO SERVICE 7 1 1 Checking the boiler before turning it on Before putting the boiler into operation the service technician must check Whether the installation co...

Страница 9: ...ht the paper through the ashtray door and fully open the regulating flap in the ashtray door The fire has caught up enough stoke a layer of mainfuel on top of the burning firewood When the fire is powerfull enough stoke more fuel right up to the bottom edge of the stoking door and level it into Provide an even layer throuhout the entire boiler depth If the fuel suddenly turns into dark red blaze o...

Страница 10: ...g system output An oversized boilers suffers unnecessarily because it has to be run at low temperatures 8 7 BOILER SHUTDOWN We do not recommend that you try to speed up the boiler combustion process The fuel must burn completly on its own on the stoker 8 7 1 Short term shut down After shutting the boiler down clean it remove all combustion residuals empty the ashtray clean the stoking door contact...

Страница 11: ...n circulate all the throught at least some of the radiators Antifreeze fluids because of their unsuitable properties we do not recommend to them They have a reduced ability to transfer heat have large volumetric expansion age and damage rubber componentss If under concrete circumstances is no other option how reliable prevent Before finalinstalation the heating system distribution piping must be f...

Страница 12: ...high positioning the boiler in the middle To comply with standarts at least 600 mm manipilation space must be left in front of the boiler Minimum distance between the back of the boiler and the wall must be also 600 mm and a free space of at least 600 mm must be left between one side of the boiler and the wall toallow acees to the rear of the boilerr Fuel must not be stacked directly behind on nex...

Страница 13: ... system and push fitted onto the boiler flue socket it should be fitted very carefully so that it does not come loose Only use parts of non flamable materials for the flue gas system 13 CHIMENYS AND CHIMNEY CONNECTION WARNINGS A sufficient flue draft of the flue gas system is the basic requirements for the correct functioning of the boiler It fundamentally affects its performance and effciency The...

Страница 14: ...tes for the purpose of recovery of insurance claims for damaged goods For confirmation of receipt deliverable is usually considered the signature of the purchaser on the accompanying documentation which is usually a delivery note invoice acceptance protocol 2 The manufacturer warrants the product 24 months from date of sale to the final consumer not more than 36 months from the date of manufacture...

Страница 15: ...mation report about the emerged failure sent by other means than by post has to be confirmed by a letter sent within three days at most Authorized person is obliged to prove to the supplier the occurrence of damage caused by the failure of the product without postponement three workdays since the request from the side of the supplier at latest Producer is obliged to take stand in written form with...

Страница 16: ...16 RECORD OF PERFORMED GUARANTEE REPAIRS Record of performed repairs within guarantee period and after Date of the record Performed activity Organization signature stamp Signature of the customer ...

Страница 17: ... Production date Stamp and signature of the distributor Date of sale Stamp and signature of the seller Date of putting into operation Stamp and signature Letter of guarantee is not valid unless properly filled in and confirmed by the seller or when rewritten in this case guarantee expires Customer is obliged to control all the documents By buying the product customer fully agrees with all conditio...

Страница 18: ...sure the conformity of the following products with the technical documentation and the requirements of relevant government regulations Product STR series wood and coal boiler Type STR PLUS 25 STR PLUS 35 STR PLUS 45 Additional information The certificate report on initial tests Certificate Z IS TGK IST 11 12 1210001399 01 11 B 00730 from 20th DECEMBER 2011 Report P IS TGK IST 11 12 12100013990111 ...

Страница 19: ...stomer s signature declares that the product is taken over without defects damage fully functional and was acquainted with the operation and use of the product Its a customer responsibility in taking the product product unpack and inspect A Letter of customer has to be sent to address of Company within 7 days from starting in operation of the product Company seller Customer ...

Отзывы: