background image

 

the    combustion    chamber,it  must    be    removed    with    a scraper  or    burnt  with  hard    wood(orcoke),running  the  
boiler at  maximum  operating  temperature. 

Please note 

Ashes should  be stored (by using proper glove) in a noncombustible container properly and   transported 

outdoors.Other waste must  not be  stored in this  container. 

9.1

 

B

OILER REPAIRS

 

The boiler may repaired by an  authorized service technician  organisation only.The user or  owner may do  

only normal maintenance and  simple  replacements of   some  parts-e.g. sealing cords. 

Please note 

When  repairing the boiler ,originals  parts must  always be  used. 

10

 

WARRANTY AND  WARRANTY CONDITIONS 

STR boilers are  covered by  warranty specifited in   the  Warranty Certificate,Service Book and  User and  

Installation Guide (chapter Introduction ,Installing the  boiler). 

10.1

 

B

OILER DELIVERY

 

The  boiler are  delivered completely assembled and  functionally testetd. 

The  delivery includes: 

1.Boiler 

2.Operating and  Installation Instructions 

3.Thero-mechanical output regulator 

4.Cleaning kit(brush,mixing rod) 

10.2

 

I

NSTALLATION 

I

NSTRUCTION

 

10.2.1

 

Boiler installation – General information 

The  STR boilers must be  put  into  service  by  an  authorized service.A network of  authorized  service  

organisations  which  meet  these  conditions is  avalaible  for all boiler  instalations,putting them  into  service and  
for  warrwnty repairs.These networks  are  organised by  agreed  distributors.The  boiler is   designed to  supply  
heating system   with  gauge  pressure up to 400 kPa  which use   water that   meets the  requirements of  related 
standarts (under  no  circumstance may the  water be  acidic,i.e. it  must  have ph ≥7,and  it  should have  minimum 
carbon  hardness).The  heating  system must be  designed  in  such  a way  that  hot water can  circulate all the  
throught  at  least    some    of    the    radiators.Antifreeze  fluids-because  of    their    unsuitable  properties,we  do  not  
recommend  to  them.They have  a reduced  ability to  transfer heat, have  large  volumetric expansion, age  and  
damage   rubber componentss.If under  concrete circumstances is no  other option how  reliable prevent. 

Before  finalinstalation,the    heating  system  distribution  piping  must    be    flushed  several  times  with 

pressurised water.In old,alredy used system,the  flushing must  be  done in  opposite direction to  the  hot water 
circulation.In    new    system,  alll  radiators  must  be    cleaned    from    conservation  material  and    rinsed  with  warm 
water  under  pressure.We    recommennd  installing  a sludge  trap  upsteam  of    the    boiler  (i.e.on    hot    water  retup 
pipe).The    sludge  trap  design  should  allowe  emptying    regular  intervals,without  the    need  to  drain  a lot  of    hot 
water.The sludge  trap  may  be  combined  with a filter, however,a  filter alone   will not  provide  an   adaquate 
protection. 

Please note  

System must be  connected to open  expansion tank  for  safety reason. Any  valve  must  not be  connected 

to  safety input and output lines. For  increasing safety of the  sytem by-pass line  must  be  installed  on  the line 
between input and output of  circulation pumps,as show in  diagrams. By-pass line´s valve  must  be kept  closed 
as    the  boiler  is    working    normally.  By-pass  line´s  valve  can  be    used    in  electricity  problems  and    must    be  
opened if there is  a risk of overheating in system water caused by an  electricity cut or problem. The  pipe used in 
by-pass  line  must  be  at  least in  the  diameter of  plumbing system pipe. UPS(Power Supply Units) can be used 
for  preventing electricity problems. 

Please note 

Any    problems  (malfunctions)  caused  by    boiler  clogging    with  dirt  from  the    heating  system  and    or 

malfunctions  induced by  clogging,are  not covered by  the  boiler warranty. The  filter as  well as  the  sludge trap 
must  be  checked and  cleaned regulary. 

Содержание STR PLUS 25

Страница 1: ...STR SERIES WOOD AND COAL BOILER INSTALLATION AND MAINTENANCE MANUAL FABRIKA SK S R O PAVLA MUDROŇA 5 01001 ŽILINA SLOVAKIA Tel 421908 599 938 e mail world fabrikask sk ...

Страница 2: ... boiler Keep the original packing until the boiler has been put into service in case the to be transported again 11 When making any repairs olny original parts must always be used It is forbidden make any changes to the boiler s internal installaton orto interfere with it any way 12 At the end of its life cyyle the boiler its package and its parts must be disposed of in a way avoiding harm ti the ...

Страница 3: ...TR PLUS 25 STR PLUS 35 STR PLUS 45 Width of the boiler W 555 555 555 Boiler depth L 700 800 900 L1 500 600 700 Water connection Water outlet VK 2 2 2 Return water RK 2 2 2 Eductive valve Chimney diameter mm 150 150 180 D 147 147 174 D1 122 122 134 D2 277 277 277 ...

Страница 4: ...Packaging Width W 640 640 640 Packaging Depth L 710 790 890 Packaging Height H 1220 1220 1220 3 BOILER COMBUSTION SYSTEM STR PLUS Series boilers are designed so that the exhaust warmth air gave a heat to the three contact surfaces and large combustion chamber provides increased user comfort ...

Страница 5: ... 270 Boiler Net Weight kg 205 226 247 5 OPERATING INSTRUCTIONS 5 1 STR SERIES GENERAL FEATURES STR series soild fuel fired boiler is designed for heating both residental and industrial buildings Beside Professional installation preconditiion for correct functionning of the boiler is required chimney thrust and correct operration STR series boiler soild fuel fired boiler is designed for heating sys...

Страница 6: ...ermeath the boiler stoker by opening or shutting a flap situated in the ashtray door When fitting the safety and the control elements remember to meet the principles of work safety If replacing of safety device and of thermo mechanical output regulator is necessary please use recommended devices in case of using any other type of the device negotiate with distributor Functionality of thermo mechan...

Страница 7: ...e Intel outlet connections of the boiler Please note It is not permissible to reverse the flows the indications for inlet and drain shown on the valve must be followed Maximum temperature of the input water for temperature safety valve is 15 C and minimum water pressure is 2 bar Functionality of safety device DBV1 must be checked or inspected by authorized person oncee in a year Safety valve Fig 0...

Страница 8: ... water volume resulting frok heating and cooling The expansion tanks and their connecting pipes must be protected against to freezing Diameter of drainage pipe must be selected properly against to overflow into tank 7 PUTTING THE BOILLER INTO SERVICE 7 1 1 Checking the boiler before turning it on Before putting the boiler into operation the service technician must check Whether the installation co...

Страница 9: ...ht the paper through the ashtray door and fully open the regulating flap in the ashtray door The fire has caught up enough stoke a layer of mainfuel on top of the burning firewood When the fire is powerfull enough stoke more fuel right up to the bottom edge of the stoking door and level it into Provide an even layer throuhout the entire boiler depth If the fuel suddenly turns into dark red blaze o...

Страница 10: ...g system output An oversized boilers suffers unnecessarily because it has to be run at low temperatures 8 7 BOILER SHUTDOWN We do not recommend that you try to speed up the boiler combustion process The fuel must burn completly on its own on the stoker 8 7 1 Short term shut down After shutting the boiler down clean it remove all combustion residuals empty the ashtray clean the stoking door contact...

Страница 11: ...n circulate all the throught at least some of the radiators Antifreeze fluids because of their unsuitable properties we do not recommend to them They have a reduced ability to transfer heat have large volumetric expansion age and damage rubber componentss If under concrete circumstances is no other option how reliable prevent Before finalinstalation the heating system distribution piping must be f...

Страница 12: ...high positioning the boiler in the middle To comply with standarts at least 600 mm manipilation space must be left in front of the boiler Minimum distance between the back of the boiler and the wall must be also 600 mm and a free space of at least 600 mm must be left between one side of the boiler and the wall toallow acees to the rear of the boilerr Fuel must not be stacked directly behind on nex...

Страница 13: ... system and push fitted onto the boiler flue socket it should be fitted very carefully so that it does not come loose Only use parts of non flamable materials for the flue gas system 13 CHIMENYS AND CHIMNEY CONNECTION WARNINGS A sufficient flue draft of the flue gas system is the basic requirements for the correct functioning of the boiler It fundamentally affects its performance and effciency The...

Страница 14: ...tes for the purpose of recovery of insurance claims for damaged goods For confirmation of receipt deliverable is usually considered the signature of the purchaser on the accompanying documentation which is usually a delivery note invoice acceptance protocol 2 The manufacturer warrants the product 24 months from date of sale to the final consumer not more than 36 months from the date of manufacture...

Страница 15: ...mation report about the emerged failure sent by other means than by post has to be confirmed by a letter sent within three days at most Authorized person is obliged to prove to the supplier the occurrence of damage caused by the failure of the product without postponement three workdays since the request from the side of the supplier at latest Producer is obliged to take stand in written form with...

Страница 16: ...16 RECORD OF PERFORMED GUARANTEE REPAIRS Record of performed repairs within guarantee period and after Date of the record Performed activity Organization signature stamp Signature of the customer ...

Страница 17: ... Production date Stamp and signature of the distributor Date of sale Stamp and signature of the seller Date of putting into operation Stamp and signature Letter of guarantee is not valid unless properly filled in and confirmed by the seller or when rewritten in this case guarantee expires Customer is obliged to control all the documents By buying the product customer fully agrees with all conditio...

Страница 18: ...sure the conformity of the following products with the technical documentation and the requirements of relevant government regulations Product STR series wood and coal boiler Type STR PLUS 25 STR PLUS 35 STR PLUS 45 Additional information The certificate report on initial tests Certificate Z IS TGK IST 11 12 1210001399 01 11 B 00730 from 20th DECEMBER 2011 Report P IS TGK IST 11 12 12100013990111 ...

Страница 19: ...stomer s signature declares that the product is taken over without defects damage fully functional and was acquainted with the operation and use of the product Its a customer responsibility in taking the product product unpack and inspect A Letter of customer has to be sent to address of Company within 7 days from starting in operation of the product Company seller Customer ...

Отзывы: