INSTALLATION PROCEDURE
-Place the boiler body on a non-flammable materials.
-Install a temperature safety valve,Watch for the arrow indicating the water flow direction.It must be as
shown in (Fig. 05).
After conncting the boiler to the heating system,screw filling and drain stopcoks into the back section.
-Screw the fluel adapter with smoke flap onto the boiler combustion gases outlet.
-Put a flue over the flue adapter and inser it into the chimney connection hole.
-The fuel diameters is 180 or 150mm .
-Install a thermo-mechanical output regulator into the opening in the top part of the front selection.
-We recommend fitting shuutting valves on the hot water inlet and outlet, without whitch would be
necessary to drain the entire heating system before the filter can be cleaned.
-No shutting valve may be installed between the boiler and the expansion vessel.
12.1
F
LUE
P
IPE
I
NSTALATION
Observe the flowing during the installation of the flue gas connection:
-Install a flue pipe connection with an inspection aperture for cleaning
-Fasten the flue gas connector piece to the boiler.
-Feed the connector into the flue gas system on a short , ascending path.Avoid deflections,especiallly
those with an angle of 90.
-Fasten and support connectors sufficiently.
-Since the flue pipe is only fixed into the flue gas system and push –fitted onto the boiler flue
socket,it should be fitted very carefully so that it does not come loose.
-Only use parts of non-flamable materials for the flue gas system.
13
CHIMENYS AND CHIMNEY CONNECTION WARNINGS
A sufficient flue draft of the flue gas system is the basic requirements for the correct functioning of the
boiler.It fundamentally affects its performance and effciency.Therefore, heed the fllowing for the flue gas
connection:
-Please note that the boiler must be connected to the flue gas system in accordande with the relevant
local
-Building code regulations, manufacture´s instructions and consultation with an approved flue installer.
-The boiler may only be connected to a flue gas system with proper flue draft (technical spec.table).
-The dimension calculations of the flue gas path must be based on the flue gas mass-flow rate at
maximum rated output.
-Theeffective chimney flue height is measured from the point of entry of the flue pipe into the
chimney.
-Ensure that the calculation of the flue gas path and the connection of the flue gas system is only
carried out by qualified personnel.
-If a wrong boiler chimney is connected,the warranty is not valit.
The figures are only guide figures.The draft dependes on the diameter,height,roughness of the chimney
wall,and the temperature difference between combustion products and the outside athmosphere.We
recommend the use of a chimney liner. Have precide calculactions carried out by a heating engineer or flue
installer.