
A1400 AIR
14
532129 04 - Rev.B
Tr
ansla
tion of the original instruc
tions
ENGLISH
2.7 TYPES OF SYSTEM SUPPLIED
The FAAC A1400 AIR series automations may be supplied as follows:
-
Automation kit: A1400 AIR KIT
-
Assembled automation: A1400 AIR PA
-
Complete entry door: A1400 AIR CS
INSTALLATION ACCORDING TO THE TYPE OF SYSTEM
SUPPLIED
!
During installation, it is recommended to comply with the order of the
sections set out based on the type of purchased supply.
A1400 AIR KIT
A
B
A. Pack containing automation components to be assembled on the
FAAC support profile.
B. Pack with FAAC profiles purchased in 4.30 m or 6.10 m long bars.
Sequence of installation phases (dedicated sections in the instructions
manual)
- Inspection and preparation (§ 3)
- Cutting the profiles (§ 5)
- Installation of the head section: assembly of the components on the
support profile (use exclusively FAAC profiles) (§ 6)
- Installation of the head section (§ 8)
- Installation of the leaves (§ 9) - for glass leaves see (§ 10)
- Electronics installation (§ 12)
- Startup (§ 13)
A1400 AIR PA
C
C. Automation assembled on FAAC* head section.
Sequence of installation phases (dedicated sections in the instructions
manual)
- Inspection and preparation (§ 3)
- Installation of the head section (§ 8)
- Installation of the leaves (§ 9) - for glass leaves see (§ 10)
- Electronics installation (§ 12)
- Startup (§ 13)
A1400 AIR CS
C
D
E
C. Automation assembled on FAAC* head section.
D. FAAC leaves (with TK20 or TK50 profiles)
E. Package with TK20 or TK50 profiles for installing the FAAC door
wall frame.
Sequence of installation phases (dedicated sections in the instructions
manual)
- Inspection and preparation (§ 3)
- Installation of the door wall frame (§ 8) with FAAC - TK50 or TK20 profiles.
- Installation of the head section (§ 8)
- Installation of the leaves (§ 9) - for glass leaves see (§ 10)
- Electronics installation (§ 12)
- Startup (§ 13)
* supplied with the required measurement and with
pre-assembled automation components.
Содержание A1400 AIR
Страница 1: ...A1400 AIR A1400 AIR DM EN16005 2012 E1SL fw 3 0 SDK EVO fw 30 LK EVO fw 1 2...
Страница 122: ......
Страница 124: ...A1400 AIR 124 53212904 Rev B...
Страница 128: ...A1400 AIR 128 53212904 Rev B...
Страница 129: ...A1400 AIR 129 53212904 Rev B...