Installing large video walls (3x3 cubes or larger)
CAUTION
Risk of injury when installing large video walls
when installing large video walls (3x3 cubes or larger), there is a risk
of injury resulting from cubes falling or crashing down.
►
Use a crane when installing video walls of 3x3 cubes or larger.
►
If you do not have a crane available, take particular care when lifting
the cubes and climbing onto the video wall.
►
Observe the following instructions when installing the video wall.
Proceed as follows when installing large video walls:
1.
First mount the entire first row onto the frames.
2.
Mount the remaining cubes in a stair-like formation. To do this, use
the already assembled rows as a platform for lifting the next cube
using the handles on the side (see the following illustration).
Mounting the projection unit
NOTICE
Incorrect handling of the screen
if the screen is handled incorrectly, the screen may be scratched or
the housing damaged.
►
Wear (cotton) gloves when installing the screen.
►
Remove the cardboard protections from the screen before mounting
it on the cube housing.
►
Lift up the screen carefully and avoid touching the screen surface.
►
Do not hold the screen in the middle of the frame since the screen
may break or fall out.
20
EC CUBE with LED Projection Engine
AsseMbly