To assemble the frame:
1.
Connect both side frames (A) and (B) with the five crossbars (C) – (G)
using the screws (H). When mounting the upper two crossbars, make
sure that the upper front crossbar (G) has two screw threads. Mount
this crossbar so that both threads are facing downwards so that the
screws can be used later to adjust the screens (see below).
2.
Screw the corner plates (L1) into each bottom corner of the frame.
Use the screws and washers (L2) provided.
3.
Now install the levelling feet (N1, N2) (used for adjusting the height
of the frame) to the corner plates as illustrated in Fig. 8, step 3. Please
observe the correct order of screws, nuts and washers (N3) to ensure
that the frame feet are properly secured.
4.
Mount the screen adjustment plates (I1) with the screws and washers
(I3) to the bottom of crossbar (G) and screw the adjustment screws
(I2) into the screen adjustment plates (I1) (see Fig. 8, step 4).
5.
Once the frame has been installed, make sure that it is absolutely
horizontal when it is in its final position. This makes the installation of
further frames and the final installation of the cube housings far
easier and prevents the individual parts from moving.
Connecting the frames together
3
You have aligned the frames.
►
Connect the frames together before stacking the cubes on top of
them. To do this, use the screws (O2) and washers and hexagon
nuts (O3) provided.
4x
(A)
(C) − (F)
(G)
(H)
(I1)
(I3)
(L1)
(N1)
(N3)
(N4)
(O3)
(O1)
(O2)
(N2)
(L2)
(I2)
(B)
16x M8x25
4x M6x60
4x M6x70
2x
16x M8
4x
2x
2x
1x
10x M10x25
2x
2x 10
2x M8
2x M6x25
2x M6x60
16x M6
8x M12
8x M12
2x M6
8x M6
18
EC CUBE with LED Projection Engine
AsseMbly