Installing a Summit X670 Series Switch
Summit Family Switches Hardware Installation Guide
291
Installing a Summit X670 Series Switch
The Summit X670 series switch fits into a standard 19-inch equipment rack. The provided
rack-mounting brackets attach to the front of the switch unit and are adaptable to either a
front-mount or mid-mount installation.
The installation process includes the following tasks:
1
Install the switch in the rack.
2
Ground the switch.
3
Install the first power supply.
4
(Optional) Install a second power supply.
5
(Optional for Summit X670V-48x switch) Install a VIM4-40G4X module.
6
Connect power cables.
7
For a stacked configuration, connect stacking cables.
8
Connect network interface cables.
If you are installing Summit X670 series switches for use in a SummitStack configuration, read
Chapter
5, “Building a SummitStack Configuration,”
before you install the switches.
NOTE
Take care to load the rack so that it is not top-heavy. Start installing equipment at the bottom of the
rack and work up.
Pre-installation Requirements
Installing the Summit X670 series switch requires two people to maneuver the switch and attach
mounting hardware.
Make sure there is adequate space behind the rack to provide access for installing power supplies and
port option cards or modules.
Summit X670 series switches are available in models with either front-to-back or back-to-front
ventilation airflow. Make sure that the power supplies for your switch have the same airflow direction
as the fans in the sw
The following items are provided with the Summit X670 series switch:
●
Two rack mounting brackets adaptable for either a front-mount or mid-mount installation
●
Twelve screws for attaching the brackets to the switch enclosure
●
Ring terminal (equivalent to Panduit PV14-8R-E) and M4 screw with captive washer for grounding
the switch
You need the following additional tools and equipment:
●
#1 Phillips screwdriver
●
Four rack mounting screws
The screw size will vary based on your organization’s rack system; screws are not provided.
●
Screwdriver for securing the switch to your organization’s rack
The screwdriver size will vary based on the requirements of your organization’s rack system.
Содержание Summit X150 Series
Страница 14: ...Preface Summit Family Switches Hardware Installation Guide 14...
Страница 15: ...PA R T About the Summit Family Switches...
Страница 16: ......
Страница 156: ...Chapter 2 Summit Power Supplies Summit Family Switches Hardware Installation Guide 156...
Страница 173: ...PA R T Installing the Hardware...
Страница 174: ......
Страница 190: ...Chapter 4 Site Preparation Summit Family Switches Hardware Installation Guide 190...
Страница 230: ...Chapter 5 Building a SummitStack Configuration Summit Family Switches Hardware Installation Guide 230...
Страница 300: ...Chapter 6 Installing Summit Family Switches Summit Family Switches Hardware Installation Guide 300...
Страница 338: ...Chapter 8 Installing Optional Ports Summit Family Switches Hardware Installation Guide 338...
Страница 339: ...PA R T Maintenance Procedures...
Страница 340: ......
Страница 382: ...Chapter 12 Replacing Port Option Cards and VIMs Summit Family Switches Hardware Installation Guide 382...
Страница 399: ...PA R T Appendices...
Страница 400: ......
Страница 503: ...Japan VCCI Class A Summit Family Switches Hardware Installation Guide 503...
Страница 504: ...Appendix B Technical Specifications Summit Family Switches Hardware Installation Guide 504...
Страница 512: ...Index Summit Family Switches Hardware Installation Guide 512...