
Power Tap Installation
Altitude 3550 Access Point Deployment Guide
24
9
Install the power cable ring terminals using the 2 screws and nut removed in steps 3 and 4.
●
Black wire to terminal L (line)
●
White wire to terminal N (neutral)
●
Green wire to terminal G (ground)
10
Firmly tighten screws and nut.
11
Adjust the cable jacket by sliding into and out of the gland until about 1 inch remains visible inside
the housing.
Tighten the gland nut by hand to firmly hold the cable jacket. Examine all wires to ensure there is no
crimping pulling of wires or terminations.
Содержание Altitude 3550
Страница 4: ...Table of Contents Altitude 3550 Access Point Deployment Guide 4...
Страница 6: ...About This Guide Altitude 3550 Access Point Deployment Guide 6...
Страница 8: ...Introduction Altitude 3550 Access Point Deployment Guide 8...
Страница 16: ...Mounting Kit Assembly and Use Altitude 3550 Access Point Deployment Guide 16...
Страница 32: ......